Permit Number: TC-COM-1023-02443
Parcel: 110072620

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1023-02443
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/16/2023 Commercial Electrical APPROVED
11/02/2023 Site Zoning APPROVED
11/21/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
11/13/2023 Commercial Mechanical REQUIRES RESUBMIT Drawing MP1 appears to be incomplete. Keynotes 6, 7, 8, 11, 12, 13, 14, 16, 17, 18, and 19 are not shown on the NEW EXAM/STORAGE MECHANICAL PLAN. Show the work to which these keynotes refer. Reference: Section 107.2.1, IBC 2018.
11/13/2023 Commercial Plumbing REQUIRES RESUBMIT Show existing and proposed locations of the stacked washer/dryer combo described in keynote 13/MP1 along with the proposed plumbing changes. Reference: Section 107.2.1, IBC 2018.
11/21/2023 Commercial Structural REQUIRES RESUBMIT Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.

1. Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.

2. Please provide the existing Site plan mentioned on the coversheet. The site plan should include, but not be limited to; A North arrow, building footprint, accessible routes to an accessible entrance and a vicinity map. Please provide street names for all adjacent streets, a fully dimensioned parking plan including tabulation of existing, proposed and required parking spaces. [IBC 107.2]

3. Provide a scope of work statement clearly indicating the extent of the work to be done with this Tenant Improvement. [IBC 107.2]

4. Please provide an existing/demolition floor plan to verify the overall scope of demolition work that is proposed. [IBC 107.2]

5. Please provide a detail to indicate the acoustical ceiling system is in conformance with [IBC Section 808] and is designed to support the walls attached to the main runners.

6. Please amend the current design occupant load analysis to specify the individual building area of each room or space that is shown on plan. Further, clarify the design occupant load used for each room or space on the plan, in accordance with the requirements of IBC Table 1004.5.

7. Provide a complete life-safety (means of egress) plan to verify the applicable provisions of IBC Chapter 10 are satisfied, such as common path of egress travel distance and maximum exit access travel distance.

8. Provide illumination for the means of egress, including the exit discharge per IBC 1008. Show compliance with the following:

a. The means of egress shall be illuminated at all times the building space is occupied.

b. The means of egress illumination level shall not be less than 1 foot-candle at the walking surface.

c. The means of egress illumination shall be supplied by backup power (consisting of storage batteries, unit equipment, or an on-site generator) for a duration of not less than 90 minutes. [IBC 1008.3]

9. Please provide method of protecting penetrations of floor or ceiling [IBC Section 714]
11/06/2023 Site Engineering REQUIRES RESUBMIT This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page:
https://tdc-online.tucsonaz.gov/#/home
NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed.
Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”
Contact Lianne Evans at lianne.evans@tucsonaz.gov or Stephen Blood at Stephen.Blood@tucsonaz.gov if you have any questions about the FUP.
11/13/2023 Fire New Construction REVIEW COMPLETED
10/23/2023 PDSD Application Completeness REVIEW COMPLETED