Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-1023-02400
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/27/2023 | Site Zoning | APPROVED | |||
| 12/27/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/22/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/21/2023 1:48:07 PM 1. Sheet S1.0: Roof framing details for the water heater enclosure are not included in the framing plans. (2018 IRC section R106) 2. Sheet S1.0: 115 mph wind is to be used in the design. (2018 IRC section R802.11.1 Amended) Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/21/2023 1:44:53 PM Prior comments: 1) Resolved - General: Provide the floor plans with the scope of work and dimensions, roof plans with dimensions, and mechanical, electrical, and plumbing plans. (2018 IRC section R106) 2) Resolved - General: Include the details showing the compliance with the 2018 IECC or submit a REScheck. 3) Resolved - General: Submit a site plan including the distances from the building to the property lines. (2018 IRC section R106.2) 4) Resolved - General: Submit the elevation views. (2018 IRC section R106) 5) Resolved - General: Include the details showing the fire-separation requirements of 2018 IRC section R302 are met as applicable. 6) Resolved - Sheet S2.0: Include the roofing assembly details and the rafter purlin bearing points on the ceiling joists at beams or walls. (2018 IRC sections R802.4.5, R901.1) Review comments for the new plans: BUILDING 1. Sheet A1: Include the details for the heating and insulation of the water heater enclosure and the water heater and washer piping protection from freezing. (2018 IECC section R402, P2603.5) 2. Sheet A1: Specify the safety glazing of the window adjacent to the tub. (2018 IRC section R308.4) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/21/2023 1:47:08 PM 1. Sheet EMP1: Show toilet room exhaust fan venting to the exterior if window is not operable. (2018 IRC section M1505.2) 2. Sheet EMP1: Include the source of combustion air for water heater. (2018 IRC section G2407) 3. Sheet EMP1: Include the details for the heating of the water heater enclosure. (2018 IRC sections 106, P2603.5) Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/21/2023 1:45:45 PM 1) Sheet EMP1: Missing receptacles meeting the location and spacing requirements of 2017 NEC section 210.52. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/21/2023 1:47:34 PM 1. Sheet EMP1: Include the details for the protection of the water heater and washer piping from freezing. (2018 IRC section P2603.5) |
||
| 12/21/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |