Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1023-02392
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/08/2023 | Commercial Electrical | APPROVED | |||
11/13/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/02/2023 | Commercial Mechanical | REQUIRES RESUBMIT | Provide mechanical ventilation for the apartment. Reference: Section R403.6, R503.1.2 and R504.1, IECC 2018. | ||
11/02/2023 | Commercial Plumbing | REQUIRES RESUBMIT | Coordinate the outlet marks for the natural gas piping. The “Fuel Gas Schematic Piping Isometric” calls out outlets 1, 2, 3, 4, and 5 but the Mechanical Plan (on P-1) shows outlets 1, 2, 4, 5, and 6. Reference: Section 107.2.1, IBC 2018. | ||
11/13/2023 | Commercial Structural | REQUIRES RESUBMIT | Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. Per International Existing Building Code 305.8.8 Type B dwelling or sleeping units, where 4 or more units are being altered are required to comply to Type B unit. Please see ANSI section 1104 for Type B unit requirements which includes reinforcements being installed in walls for future installation of grab bars, etc. 2. Please resubmit |
||
10/12/2023 | PDSD Application Completeness | REVIEW COMPLETED |