Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1023-02389
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/26/2023 | Site Zoning | APPROVED | |||
| 11/02/2023 | Water - PDSD | APPROVED | |||
| 10/30/2023 | Site Engineering | NOT REQUIRED | |||
| 11/07/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/07/2023 | External Reviewers - Willdan | REQUIRES RESUBMIT | Questions on review comments contact Bill McClellan by email at bmcclellan@willdan.com or message on cell # (928)580-3179 and svasquez@willdan.com 480.489.2463 for coordination. 1. Sheet TS1 "B" Occupancy group per 303.1.1 (BM) 2. Sheet D1.0 Clarify existing fixture (5) to remain, plumbing sheet P5.0 (CW & HW riser ) identifies a future fixture next to water heater, IBC 107.2.1 (BM) 3. Sheet A2.1 Fixtures #7,8 & 9 do not match plumbing plan sheets P4.0, P5.0 & detail #2 on sheet A2.5. Provide correct information on plans per 107.2.1 (BM) 4. Sheet A2.1 Equipment schedule item #27 also in detail 10 on sheet A2.6 has a different description than on sheet E3.1 panel B schedule, circuits 4/6 & 8/10. Clarify Also identify if equipment will require a hood per IMC 502.1 & 506 or is self contained and listed to be installed without hood (BM) 5. Sheet A2.3 At restrooms, demo note #14 on sheet D1.0 states to remove tile. Non absorbent surface is required at WC walls per IBC 2509.1 & 1209.2.2. Clarify which page notes are correct (BM) 6. Sheet P3.0 Clarify fixture K16, not in plumbing fixture schedule (BM) 7. Sheet P3.0 K7 is mop sink, K8 is a mash sink in plumbing fixture schedules. Clarify K8 fixture (BM) 8. Sheet P5.0 Clarify existing required vent location on soils and vent riser for Grease Interceptor as per IPC 1003.9 (BM) 9. Sheet E3.1 Water heater and recirculating pump are are identified on sheet P4.0, will need to identify clear work space in front of existing panels as per NEC 110.26 (BM) |
||
| 10/26/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 10/12/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |