Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1023-02385
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/26/2023 | Site Zoning | APPROVED | MASTER PLANS IN STUDIO SESSION FOR TC-COM-1023-02385/BLDG1, AND WILL BE USED FOR TC-COM-1023-02394/BLDG 2 | ||
11/02/2023 | Water - PDSD | APPROVED | MASTER PLANS IN STUDIO SESSION FOR TC-COM-1023-02385/BLDG1, AND WILL BE USED FOR TC-COM-1023-02394/BLDG 2 | ||
10/30/2023 | Site Engineering | NOT REQUIRED | MASTER PLANS IN STUDIO SESSION FOR TC-COM-1023-02385/BLDG1, AND WILL BE USED FOR TC-COM-1023-02394/BLDG 2 | ||
11/02/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | MASTER PLANS IN STUDIO SESSION FOR TC-COM-1023-02385/BLDG1, AND WILL BE USED FOR TC-COM-1023-02394/BLDG 2 | ||
10/18/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/18/2023 2:19:21 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/18/2023 2:16:12 PM 1) General: The Comcheck needs to be for the currently adopted 2018 IECC energy code. 2) Sheet c0.01 (Cover Sheet): Provide the building data, occupancy, and plumbing calculations for each building separately. Please clearly identify which building is being applied for under this permit and specify all other drawings and details as under a separate permit. (2018 IBC section 107) 3) Sheets c0.01 (Cover Sheet) and a1.01 (Floor Plans): Include a scope of work for each building and describe the type of business activity (doctor's office, auto repair, professional services, etc) as well as the uses or items stored in the S-2 areas. The electrical plans specify that there are welding and air compressor circuits. Please revise all affected sheets. (2018 IBC sections 107, 304.1, 311.3) 4) Sheets c0.01 and g1.00 (Occupancy Calculations): The rooms or spaces used for assembly purposes such as conference rooms, break areas, lobby/waiting rooms, etc. are to be calculated at 1 person per 15sf (tables and chairs), 1 per 7sf (chairs only), or 1 per 5sf (standing space). Please revise all affected sheets. (2018 IBC section 1004, table 1004.5) 5) Sheet a1.01 (Floor Plans): Provide details if the "Bull Pen" has concentrated business use as detailed in 2018 IBC section 1004.8. Revise the occupancy calculations and all affected sheets. Show furniture plans for this space. 6) Sheet a1.01 (Floor Plans): Building 1 does not include a drinking fountain, and a service sink. Depending on the actual occupant load separate male/female toilet room facilities may be required. (2018 IPC sections 403, 403.2, Table 403.1, 2018 IEBC section 809.1) 7) Sheet a1.01 (Floor Plans): A minimum of 2hr fire separation is required between "B" and "S-2" uses. Please revise all affected details for fire-rated walls and doors. (2018 IBC Table 508.4, Table 716.1(2)) 8) Sheet p2.0 (Plumbing Diagrams): The supply piping diagrams do not include the toilets, service sink (building 1), and drinking fountains (building 1). (2018 IPC section 106.3.1) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/18/2023 2:18:11 PM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/18/2023 2:17:54 PM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/18/2023 2:18:27 PM See the building review comments |
||
10/26/2023 | Fire New Construction | REQUIRES RESUBMIT | Address SAFEbuilt comments. Questions: patricia.shelton@tucsonaz.gov |
||
10/12/2023 | PDSD Application Completeness | REVIEW COMPLETED |