Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.7
Permit Number - TC-COM-1023-02384
Review Name: COMMERCIAL REVIEW - FULL v.7
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/25/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
11/25/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 Please revise the 2012 lighting Comcheck certificate and calculations to the current adopted 2018 IECC. REF; 2018 IBC, 2017 NEC, 2018 IECC |
||
11/21/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018. | ||
11/21/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Sections 412.11 and 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. 3. Show how the temperature of the tempered water supply to the public lavatories is controlled. Reference: Sections 419.5 and 607.1.2, IPC 2018 and Section C404.3, IECC 2018. |
||
11/18/2024 | Commercial Structural | REQUIRES RESUBMIT | Please submit your revised documents along with a detailed response letter, which states how all Building Review Section comments were addressed. These plans are incomplete and further comments may arise after the original comments are addressed. 9. Provide detailed drawings and finish schedule to show compliance with IBC Section 1209 to include finishes required in toilet and bathroom areas. NEW COMMENTS FROM THIS REVIEW 9B. Please amend Floor Plan Keynotes to show materials used as a base for wall tile in tub and shower areas and wall and ceiling panels in shower areas shall be of materials listed in Table 2509.2 and installed in accordance with the manufacturer’s recommendations. Green GWB is not permitted to be used as a backerboard for wall tile in a shower area IBC 2509.2 TABLE 2509.2 BACKERBOARD MATERIALS 1. Glass mat gypsum backing panel 2. Non-asbestos fiber-cement backer board 3. Non-asbestos fiber-mat reinforced cementitious backer unit Mark Masek Plans Examiner Mark.masek@tucsonaz.gov 520-837-4994 | ||
11/12/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |