Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-1023-02378
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/16/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/16/2023 | Commercial Electrical | REQUIRES RESUBMIT | Permit Review TC-COM-1023-02378 (327 S 4TH AV TUCSON, AZ 85701) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). It appears the permit documents uploaded lists multiple units and each individual unit requires its own permit. This permit is for the identified main address 327 S 4TH AV only (Laundry circuit), please start new permits for all other units. Notate the COT adopted code on the plan-set. 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. 2. Provide a Site Plan, Indicate the location and size of buildings, utility meters and lines supporting the alterations, 2018 IBC 107.1. Show the utility lines requiring upgrade or replacement. 3. Provide a complete line diagram, NEC 110.2, 2018 IBC 107.1. 4. Provide electrical load calculations, for the Main Service Panels, Per NEC 220.40. 5. Show the location of the panel on the Electrical Plan with clear working space compliance, 2017 NEC 110.26(A) 6. Provide an electrical riser diagram, 2017 NEC 230.9. Notate the grounding and bonding method, 2017 NEC 250.20(B), 250.24, 250.30(A)(4). Metallic gas lines must be bonded and not be used as the primary grounding method, 2017 NEC 250.50, 250.52(B)(1). 7. Show the mast height on the electrical riser diagram, NEC 230.24. a. Providing 8’ clearance above the roof Or relocate the service entrance to a code compliant location, 2017 NEC 230.24(A). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
10/11/2023 | PDSD Application Completeness | REVIEW COMPLETED | It appears the permit documents uploaded lists multiple units and each individual unit requires its own permit. This permit is for the identified main address 327 S 4TH AV only, please start new permits for all other units. |