Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-1023-02359
Parcel: 14023104A

Address:
6090 S PARK AV

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-1023-02359
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/13/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/21/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Keith Miller
kmiller@safebuilt.com
Approved
Reason:
Date Completed : 2/16/2024 1:38:02 PM
Structural review is approved. Subject to the field inspector's approval.



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 2/16/2024 1:31:29 PM
1) Resolved - General: Show the accessibility details and dimensions. (2009 ICC A117.1)

2) Unresolved - General: Include the details for the sprinkler system if installed or as a deferred submittal. (2018 IBC 107.1, 2018 IEBC section 106.1) Sprinklers are not listed as existing, new , deferred submittal, or not being installed.

3) Unresolved - Sheets A-2 (Floor Plan), MP2.0 (Plumbing Drawings): A public toilet room is required for the newly framed and designed toilet room. Please revise all affected sheets. (2018 IPC section 403.3, Table 403.1, 2018 IEBC section 801.3)
Clarify that the toilet room is a public restroom and on an accessible route on the plans.



Mechanical(M) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 2/16/2024 1:37:18 PM
Pending the drinking fountain and plumbing/toilet room revisions. No mechanical revisions are needed at this time.



Electrical(E) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 2/16/2024 1:36:48 PM
Pending the drinking fountain and plumbing/toilet room revisions. No electrical revisions are needed at this time.




Plumbing(P) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 2/16/2024 1:33:41 PM
1) Resolved - General: Show the accessibility details and dimensions. (2009 ICC A117.1)

2) Unresolved - General: Include the details for the sprinkler system if installed or as a deferred submittal. (2018 IBC 107.1, 2018 IEBC section 106.1) Sprinklers are not listed as existing, new , deferred submittal, or not being installed.

3) Unresolved - Sheets A-2 (Floor Plan), MP2.0 (Plumbing Drawings): A public toilet room is required for the newly framed and designed toilet room. Please revise all affected sheets. (2018 IPC section 403.3, Table 403.1, 2018 IEBC section 801.3)
Clarify that the toilet room is a public restroom and on an accessible route on the plans.

4) Unresolved - Sheet MP2.0 (Plumbing and Mechanical Plans): Show water fountains or specify alternative source of drinking water. (2018 IPC section 410.1) Drinking fountains are not shown.

5) Resolved - Sheet MP2.0 (Plumbing and Mechanical Plans): Show all plumbing fixtures in the DWV isometric diagram and detail the pipe sizes of all drain or vent segments and common vents. (2018 IPC section 106.3.1)
03/13/2024 Fire New Construction REVIEW COMPLETED
02/16/2024 PDSD Application Completeness Express REVIEW COMPLETED