Permit Number: TC-COM-1023-02344
Parcel: 11520198A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-1023-02344
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/17/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/17/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/17/2024 1:23:05 PM

1) Unresolved - General: Provide the design details, occupancy use, occupancy load, construction type, area, floor plans, elevations, structural design, foundations/footings, MEP plans, etc. for each structure. Drawings and construction details for many structures (covered bleachers, basketball court cover, each ramada, membrane structures, etc.) were not submitted. Include the exterior areas under roof cover (solid or membrane) in the building area and occupancy calculations. (2018 IBC section 107.1) If there are numerous structures that are either deferred submittals or will be applied for under a separate permit, please include lists for the deferred submittal and separate permits on the cover sheet. Clearly identify each specific structure on the plans as not part of this permit including the alternate structures. Many of these structures are shown as new and part of phase one but not identified as being applied for separately. Each individual structure that is applied for as part of this permit and being reviewed needs to have the building data (listed above) included on the cover sheet. ***Several structures not detailed on the separate permit list and the structures included in this permit. The splash pad and grill island, basketball courts, batting cages, playground areas, maintenance structure, fences, and light poles are not detailed if they are included in this permit or separate permit. If the dugouts are being installed under this permit, include the location, dimensions, accessibility details, and specify type 1 or 2 dugouts on sheet SP01. If bleachers are being installed, include the design and structural drawings, and show the locations of the bleachers on sheets SP01 and SP02. Include the construction type, height, etc. for each structure included in this permit. Provide the footing/foundation details for all structures including the bleachers, light poles, basketball courts, etc. Any special inspections for these structures will need to be listed separately. ***




Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/17/2024 1:22:33 PM

1) Unresolved - General: Provide the design details, occupancy use, occupancy load, construction type, area, floor plans, elevations, structural design, foundations/footings, MEP plans, etc. for each structure. Drawings and construction details for many structures (covered bleachers, basketball court cover, each ramada, membrane structures, etc.) were not submitted. Include the exterior areas under roof cover (solid or membrane) in the building area and occupancy calculations. (2018 IBC section 107.1) If there are numerous structures that are either deferred submittals or will be applied for under a separate permit, please include lists for the deferred submittal and separate permits on the cover sheet. Clearly identify each specific structure on the plans as not part of this permit including the alternate structures. Many of these structures are shown as new
and part of phase one but not identified as being applied for separately. Each individual structure that is applied for as part of this permit and being reviewed needs to have the building data (listed above) included on the cover sheet. ***Several structures not detailed on the separate permit list and the structures included in this permit. The splash pad and grill island, basketball courts, batting cages, playground areas, maintenance structure, fences, and light poles are not detailed if they are included in this permit or separate permit. If the dugouts are being installed under this permit, include the location, dimensions, accessibility details, and specify type 1 or 2 dugouts on sheet SP01. If bleachers are being installed, include the design and structural drawings, and show the locations of the bleachers on sheets SP01 and SP02. Include the construction type, height, etc. for each structure included in this permit. Provide the footing/foundation details for all structures including the bleachers, light poles, basketball courts, etc. Any special inspections for these structures will need to be listed separately. ***

2) Resolved - General: Show the accessible routes and areas for the structures and play areas. (2009 ICC A117.1 Sections 1101.2, 1108, 1108.4.1.3)

3) Resolved - Sheets PVD05 through PVD11: The dugout drawings are labeled as Paving Details. (2018 IBC section 107.1)

4) Resolved - Sheets PVD06 and SPN01: Incorrect codes shown. The structures are to be designed based on the 2018 ICC codes, 2017 NEC.

5) Resolved - Sheet AP01: Show the accessible turning radius and the fixture clear floor spaces (with dimensions) in the toilet rooms and lavatories. (2009 ICC A117.1 sections 304.3, 305.3, 603.2.1, 606.2) The turning radius is required in the toilet rooms not in the toilet compartments per 2009 ICC A117.1.



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 11/20/2023 5:14:42 PM



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 10/23/2023 11:05:36 AM
Electrical Review of Murrieta Park
By: Ron Ross PE

ELP12: Could not locate Keynote 2.

ELP13: Could not locate Keynotes 2 & 3.




Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved with Comments
Reason:
Date Completed : 12/22/2023 1:00:28 AM

Third plumbing review: OK Hot water not required per assistant Building Official Matthew Carlton
1).Ok

Resolved2). Lavatories on plan pages PLP03, PLP04, PLP08 needs hot water -IPC 607.1 and then will need ASSE 1070 mixing valves -IPC 419.5** Hot water not required per assistant Building Official Matthew Carlton

3). Resolved- Facility needs high low drinking fountain(s) -IPC 403.1 update all affected page
01/16/2024 PDSD Application Completeness Express REVIEW COMPLETED