Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1023-02344
Parcel: 11520198A

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.3

Permit Number - TC-COM-1023-02344
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/23/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/18/2025 External Reviewers - SAFEBuilt REQUIRES RESUBMIT SCOREBOARD FOUNDATION - - NOT RESUBMITTED WITH THIS UPLOAD
07/22/2025 Concrete Installation Inspection (Deferred Submittal) Express REVIEW COMPLETED BLEACHER/SHADE STRUCTURE
07/22/2025 Concrete Installation Inspection (Deferred Submittal) Express REVIEW COMPLETED CONCESSIONS/RESTROOM
07/22/2025 Concrete Installation Inspection (Deferred Submittal) Express REVIEW COMPLETED Splash Pad/Restroom Equip Bldg
07/23/2025 County Health Inspection (Deferred Submittal) Express REVIEW COMPLETED
07/22/2025 Masonry Inspection (Deferred Submittal) Express REVIEW COMPLETED CONCESSIONS/RESTROOMS
07/22/2025 Masonry Inspection (Deferred Submittal) Express REVIEW COMPLETED Splash Pad/Restroom Equip Bldg
07/18/2025 PDSD Application Completeness Express REVIEW COMPLETED
07/22/2025 Post-Installed Anchor Inspection (Deferred Submittal) Express REVIEW COMPLETED BLEACHER/SHADE STRUCTURE
- Not performed per PE note
07/22/2025 Post-Installed Anchor Inspection (Deferred Submittal) Express REVIEW COMPLETED CONCESSIONS/RESTROOM
07/22/2025 Post-Installed Anchor Inspection (Deferred Submittal) Express REVIEW COMPLETED Splash Pad/Restroom Equip Bldg
-Not performed per PE note
07/22/2025 Site Prep Inspection (Deferred Submittal) Express REVIEW COMPLETED CONCESSIONS/RESTROOMS
07/22/2025 Site Prep Inspection (Deferred Submittal) Express REVIEW COMPLETED Splash Pad/Restroom Equip Bldg
07/22/2025 Welding Inspection (Deferred Submittal) Express REVIEW COMPLETED CONCESSIONS/RESTROOMS
07/22/2025 Welding Inspection (Deferred Submittal) Express REVIEW COMPLETED Splash Pad/Restroom Equip Bldg