Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1023-02344
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/24/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/24/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/17/2023 5:53:22 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/17/2023 5:52:45 PM 1) Unresolved - General: Provide the design details, occupancy use, occupancy load, construction type, area, floor plans, elevations, structural design, foundations/footings, MEP plans, etc. for each structure. Drawings and construction details for many structures (covered bleachers, basketball court cover, each ramada, membrane structures, etc.) were not submitted. Include the exterior areas under roof cover (solid or membrane) in the building area and occupancy calculations. (2018 IBC section 107.1) 2) Resolved - General: Show the accessible routes and areas for the structures and play areas. (2009 ICC A117.1 Sections 1101.2, 1108, 1108.4.1.3) 3) Resolved - Sheets PVD05 through PVD11: The dugout drawings are labeled as Paving Details. (2018 IBC section 107.1) 4) Resolved - Sheets PVD06 and SPN01: Incorrect codes shown. The structures are to be designed based on the 2018 ICC codes, 2017 NEC. 5) Unresolved - Sheet AP01: Show the accessible turning radius and the fixture clear floor spaces (with dimensions) in the toilet rooms and lavatories. (2009 ICC A117.1 sections 304.3, 305.3, 603.2.1, 606.2) The turning radius is required in the toilet rooms not in the toilet compartments per 2009 ICC A117.1. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 11/20/2023 5:14:42 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 10/23/2023 11:05:36 AM Electrical Review of Murrieta Park By: Ron Ross PE ELP12: Could not locate Keynote 2. ELP13: Could not locate Keynotes 2 & 3. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 11/23/2023 11:33:02 PM Second plumbing review: Comments 1 & 2 Remain Unresolved-1).Need to address building plan review comment 1 -IPC 403.1 Unresolved2). Lavatories on plan pages PLP03, PLP04, PLP08 needs hot water -IPC 607.1 and then will need ASSE 1070 mixing valves -IPC 419.5 **Hot water is required** Provide documentation from local authority stating Cold water only is approved** 3). Resolved- Facility needs high low drinking fountain(s) -IPC 403.1 update all affected pages |
||
11/16/2023 | PDSD Application Completeness | REVIEW COMPLETED |