Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-1023-02344
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/22/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/22/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/19/2023 9:17:55 AM See the building review comments Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/19/2023 9:17:21 AM 1) Unresolved - General: Provide the design details, occupancy use, occupancy load, construction type, area, floor plans, elevations, structural design, foundations/footings, MEP plans, etc. for each structure. Drawings and construction details for many structures (covered bleachers, basketball court cover, each ramada, membrane structures, etc.) were not submitted. Include the exterior areas under roof cover (solid or membrane) in the building area and occupancy calculations. (2018 IBC section 107.1) If there are numerous structures that are either deferred submittals or will be applied for under a separate permit, please include lists for the deferred submittal and separate permits on the cover sheet. Clearly identify each specific structure on the plans as not part of this permit including the alternate structures. Many of these structures are shown as new and part of phase one but not identified as being applied for separately. Each individual structure that is applied for as part of this permit and being reviewed needs to have the building data (listed above) included on the cover sheet. 2) Resolved - General: Show the accessible routes and areas for the structures and play areas. (2009 ICC A117.1 Sections 1101.2, 1108, 1108.4.1.3) 3) Resolved - Sheets PVD05 through PVD11: The dugout drawings are labeled as Paving Details. (2018 IBC section 107.1) 4) Resolved - Sheets PVD06 and SPN01: Incorrect codes shown. The structures are to be designed based on the 2018 ICC codes, 2017 NEC. 5) Resolved - Sheet AP01: Show the accessible turning radius and the fixture clear floor spaces (with dimensions) in the toilet rooms and lavatories. (2009 ICC A117.1 sections 304.3, 305.3, 603.2.1, 606.2) The turning radius is required in the toilet rooms not in the toilet compartments per 2009 ICC A117.1. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 11/20/2023 5:14:42 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 10/23/2023 11:05:36 AM Electrical Review of Murrieta Park By: Ron Ross PE ELP12: Could not locate Keynote 2. ELP13: Could not locate Keynotes 2 & 3. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved with Comments Reason: Date Completed : 12/22/2023 1:00:28 AM Third plumbing review: OK Hot water not required per assistant Building Official Matthew Carlton 1).Ok Resolved2). Lavatories on plan pages PLP03, PLP04, PLP08 needs hot water -IPC 607.1 and then will need ASSE 1070 mixing valves -IPC 419.5** Hot water not required per assistant Building Official Matthew Carlton 3). Resolved- Facility needs high low drinking fountain(s) -IPC 403.1 update all affected page |
||
12/15/2023 | PDSD Application Completeness | REVIEW COMPLETED |