Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.2
Permit Number - TC-COM-1023-02329
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/02/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/02/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Comment not resolved. Provide complete construction documents and information to address all of the points in the initial comment. [Initial comment: Provide construction documents drawn to scale and with sufficient detail and clarity to demonstrate that the work complies with the applicable codes. The information shall, as a minimum, include the proposed location of the new condensing unit, any structural changes necessitated by the location of the condensing unit, any electrical changes resulting from adding the new split system, complete specifications for the new heating equipment, provisions for condensate disposal, and provisions for mechanical ventilation of the dwelling unit. Reference: Section 107.2.1, IBC 2018.] 2. Comment not resolved. Show that the new split system complies with Sections R403.1 and R503.1.2, IECC 2018 and also complies with the Department of Energy efficiency requirements that went into effect on January 1, 2023. [Initial comment: Provide the specifications for the proposed new AC system. The system shall comply with Sections R403.1 and R503.1.2, IECC 2018 and shall comply with the Department of Energy efficiency requirements that went into effect on January 1, 2023.] |
||
| 11/02/2023 | Commercial Plumbing | REQUIRES RESUBMIT | Comment not addressed. Provide a written response to all comments. [Initial comment: Clarify the scope of work for plumbing changes, if any. Reference Section 107.2.1, IBC 2018.] | ||
| 10/30/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |