Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1022-00001
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/06/2023 | Commercial Building | APPROVED | |||
11/08/2022 | Site Zoning | APPROVED | |||
11/22/2022 | Site Engineering | NOT REQUIRED | |||
01/12/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/15/2022 | Commercial Electrical | REQUIRES RESUBMIT | Provide complete compliance with the 2018 IECC for the lighting. ComCheck is acceptable. | ||
01/12/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Condensate drains shall be terminated at an approved disposal location (i.e. not a splash block on the roof). Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson. 2. HVAC General Note #7 refers to detail #3 on sheet M2 but sheet M2 is not part of the drawing set. Reference: Section 107.2.1, IBC 2018. 3. The outside air calculations should be noted as being based on the 2018 IMC. Reference: Section 107.2.1, IBC 2018 |
||
01/12/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Revise the hot water distribution system so that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 2. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. |
||
12/02/2022 | Fire New Construction | REVIEW COMPLETED | |||
11/01/2022 | PDSD Application Completeness | REVIEW COMPLETED |