Permit Number: TC-COM-0926-01614
Parcel: 13316030G

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0926-01614
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/16/2026 Commercial Electrical Standard APPROVED
10/21/2026 Commercial Mechanical Standard APPROVED
10/22/2026 Site Zoning Standard APPROVED
10/21/2026 Water - PDSD Standard APPROVED
10/15/2026 Outdoor Lighting Standard NOT REQUIRED
10/07/2026 Site Engineering Standard NOT REQUIRED
10/22/2026 Commercial Post Review Express PENDING ASSIGNMENT
10/21/2026 Commercial Building Standard REQUIRES RESUBMIT Please submit a complete set of revised/corrected documents and a written response addressing each review comment and explaining how it was resolved. Please note that the original submittal was incomplete, and the review was based on the information provided. Additional comments may be issued upon subsequent review.
Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov
1. Please add missing sheet P3.0 to the plan set with the next submittal. IBC 107.2.1
2. Sheet g2.0: Please revise the Occupancy Tables to reflect the 2024 IBC. IBC 107.2.1
3. Per IEBC Section IEBC 306.7, accessibility must be provided to the altered spaces. This includes the primary entrance, primary path of travel, sanitary facilities, drinking fountains, and signage. Please amend plans to show compliance with IEBC 306.7.
For example, the toilet room9R104 & R105 do not appear to meet the clearance requirements of ICC A117.1-2017, Section 604.3.
4. If the cost of providing or upgrading the items listed above to meet accessibility requirements is disproportionate to the overall cost of construction (i.e., exceeds 20% of the construction cost, excluding accessibility upgrades), please provide documentation to verify construction costs.
If this exemption is used, accessibility improvements totaling at least 20% of the construction cost must still be provided. For example, if the project valuation is $3,000, then a minimum of $600 should be allocated toward accessibility upgrades. However, only the amount necessary to achieve full compliance is required to be spent.

Please contact me if you have any questions about the above comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
10/21/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Sheet p3.0 is missing from the drawing set. Reference: Section 107.2.1, IBC 2024.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
10/22/2026 Fire New Construction Standard REVIEW COMPLETED
10/01/2026 PDSD Application Completeness Express REVIEW COMPLETED