Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0926-01584
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/13/2026 | Commercial Electrical Standard | APPROVED | |||
| 10/13/2026 | Outdoor Lighting Standard | APPROVED | |||
| 09/28/2026 | Site Engineering Standard | APPROVED | |||
| 10/15/2026 | Water - PDSD Standard | APPROVED | |||
| 10/16/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/16/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit a complete set of revised/corrected documents and a written response addressing each review comment and explaining how it was resolved. Please note that the original submittal was incomplete, and the review was based on the information provided. Additional comments may be issued upon subsequent review. Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov 1. Sheet G1.1: Existing Building – Special Inspections: Please clarify the type of special inspection being requested for Item #1, “Existing Building,” and identify the applicable code requirements. Please provide a Statement of Special Inspections, including a project-specific schedule identifying all required special inspections and tests, in accordance with 2024 IBC Sections 1704.2.3 and 1705, as applicable. 2. Sheet G1.2: Code Analysis: Classification of Work – Alteration: The proposed work area appears to exceed 50% of the aggregate building area. Please revise the Classification of Work to indicate a Level 3 Alteration in accordance with the 2024 IEBC. Change of Occupancy: Please describe the previous occupancy of this building. For example, Group B/F-2 to Group B. Please revise the construction documents to identify the change of occupancy and demonstrate compliance with the applicable IEBC requirements. 3. Sheet A6.2: Restrooms 109 and 110 do not provide the required 60-inch clearance width, as the lavatories encroach into the required clearance. 2017 ICC A117.1 604.3 Please revise the restroom configurations to provide the required 60-inch clearance measured perpendicular to the sidewall or demonstrate compliance with the exception in 2024 IBC Section 1110.2, Exception 3. If utilizing the exception, provide the required signage in accordance with 2024 IBC Section 1112.1 and indicate the sign details and locations on the plans. 4. Sheet A6.2: Please revise the mirror height to ensure the bottom edge of the reflecting surface 40 inches maximum above the floor. 2017 ICC A117.1 603.3 5. Sheet A6.1: Please demonstrate on the plans the microwave oven meets the obstructed side reach requirements of 2017 ICC A117.1 308.2.2 & 309.1 for the operable parts Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 10/15/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0926-01584 ADDRESS/PARCEL: 7575 E SPEEDWAY BL TUCSON, AZ 85710 Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov. COMMENTS: 1. The installation or replacement of a boiler in Arizona requires a Certificate Inspection from the Industrial Commission of Arizona. The City of Tucson will provide a permit for the installation of the utilities that support the boiler (e.g. fuel, power, drains, etc.) but the installation, clearances, and special egress requirements for the boiler itself are controlled by the Industrial Commission of Arizona. You can start the process of obtaining a Certificate Inspection process by going to https://www.azica.gov/forms/adosh-boiler-boiler-and-pressure-vessel-new-install-reinstall-form 2. It appears the south corridor is being utilized as a return air duct. Corridors are not permitted to be used as a return-air path. Please clarify. Reference: Section 601.2, 2024 IMC. |
||
| 10/15/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0926-01584 ADDRESS/PARCEL: 7575 E SPEEDWAY BL TUCSON, AZ 85710 Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov. COMMENTS: 1. Please show a cleanout at the junction of the building drain and the building sewer at each location where the building drain exits the building and transitions to the building sewer. Reference: Section 708.1.3, IPC 2024. |
||
| 10/16/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | -Please explain if this is a change of occupancy. You currently mention level 1, level 2 for the fire alarm, and change of occupancy. Please explain and define your separate work areas if you're using different levels of alteration within the same building. If it is a change of occupancy, you will be using Chapter 10 of the IEBC for the fire protection systems (fire alarm). -What was the previous occupancy classification? -The proposed use of "B" occupancy, does not require a fire alarm. Please explain your intentions with the fire alarm. Sheet G1.2 mentions "heat detection" is required in your code analysis, however, the building calculations on the same sheet state no fire alarm. Resolve the confusion and conflicting information regarding the fire alarm. john.vincent@tucsonaz.gov 5203495581 |
||
| 09/25/2026 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 10/16/2026 | Site Zoning Standard | REVIEW COMPLETED |