Permit Number: TC-COM-0926-01529
Parcel: 10306092J

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0926-01529
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/01/2026 Outdoor Lighting Standard APPROVED
10/06/2026 Water - PDSD Standard APPROVED
10/12/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/08/2026 Commercial Building Standard REQUIRES RESUBMIT Please submit a complete set of revised/corrected documents and a written response addressing each review comment and explaining how it was resolved. Please note that the original submittal was incomplete, and the review was based on the information provided. Additional comments may be issued upon subsequent review.

Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov
1. Drawing G-009 – Sheet 9 of 148: Life Safety/Means of Egress
Please provide the following means of egress and occupant load information on the plan. 2024 IBC Sections 107.2.3 and 1004.5.
A. Provide a scaled Life Safety/Means of Egress plan. 2024 IBC Section 107.2.3.
B. The area of Room 101 appears to exceed 700 SF. The area calculation should include the space behind the folding partition. Please revise the room area accordingly.
C. Indicate the area, use/function, and occupant load factor for each space. The proposed factor of 15 SF/person indicates tables and chairs. Please verify and provide a furniture plan if this is the proposed arrangement.
D. Based on the revised occupant load, Room 101 may have an occupant load of 50 or more. If so, two exits are required, separated by a minimum of ½ the maximum diagonal distance. 2024 IBC Section 1007.1.1.
E. Doors serving an A occupancy with an occupant load of 50 or more are required to be provided with panic hardware. 2024 IBC Section 1010.2.8.
F. Revise the plans to show exit signs at required exit doors and along the egress path, including locations necessary to direct occupants to the exits. Exit signs are required at changes in direction and where necessary to clearly indicate the direction of egress, with additional spacing requirements as applicable. 2024 IBC Section 1013.1.

2. Drawing G-012 – Sheet 12 of 148
Please remove Metal Building Systems Notes 1 and 2 if they are not applicable to this project. 2024 IBC Section 107.2.1.
3. Drawing A-201 – Sheet 51 of 148: Door 104
Please provide the required door maneuvering clearance at Door 104. A minimum of 18 inches is required at the pull side where applicable. 2017 ICC A117.1 Section 404.2.3.2.
Alternatively, revising the door swing may resolve the clearance issue. Please show the required maneuvering clearances on the plans for all doors located on the accessible route. Treat as a typical note.
4. Drawing A-201 – Sheet 51 of 148: Door 107B
Please provide the required door maneuvering clearance at Door 107B. A minimum of 18 inches is required at the pull side where applicable. 2017 ICC A117.1 Section 404.2.3.2.
Please show the required maneuvering clearances on the plans for all doors located on the accessible route.
5. Accessible Entrances and Exits
Please identify the two required accessible entrances and the required accessible exit doors on the drawings. Provide directional signage at entrances and exits that are not accessible, directing occupants to the accessible entrances/exits. 2024 IBC Section 1009.10.
6. Please revise the Code analysis and plumbing fixture requirements, as required after recalculating the design occupant load and exiting. 2024 IBC Section 107.2.1
Building Permit Calculation Package
7. For record-keeping purposes, please separate the Building Permit Calculation Package into the following four individual PDF files:
1. Structural Calculations
2. Heating and Cooling Load Calculations
3. Energy Compliance Certificates
4. Electrical Load Calculations

Please contact me if you have any questions about the above comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
10/01/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0926-01529 (2550 W SWEETWATER DR TUCSON, AZ 85705)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Designate and show all indoor wet and damp locations.
2. Designate and show all locations subject to corrosive environments.
3. Provide GFCI protection for all receptacles within indoor wet and damp locations per NEC 210.8(B). All wiring shall meet the requirements of NEC 300.6, 300.9, 310.10(C). Equipment shall meet the requirements of NEC 406.9.
4. GFCI shall include all cord-and-plug appliances such as water heaters and mop sink sub pump, per NEC 210.8(8)(7) & 210.8(D)(6).
5. All corrosive environment areas shall provide wiring methods and equipment suitable for corrosive environments, NEC 300.6. Reference sheet E-202, Sheet Keynotes 1.
10/06/2026 Commercial Mechanical Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0926-01529
ADDRESS/PARCEL: 2550 W SWEETWATER DR TUCSON, AZ 85705

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. ERV-2 does not appear to be shown on the mechanical floor plan but is shown as providing outdoor air to the hallway (106). Please clarify. Reference: Section 107.2.1, IBC 2024.
2. Please clarify how ERV-1 is delivering outdoor air to the Visitor Area. The mechanical floor plan does not appear to show any supply grilles in the Visitor Area, only a return grille. Reference: Section 107.2.1, IBC 2024.
3. Clarify the schedule of operation for the restroom exhaust fans (note 4, Ventilation Requirements and Schedule, G-028), “Assume 50 CFM continuous exhaust when occupied..”. Do you mean during “hours of operation” or just when the restroom itself is occupied?
10/06/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0926-01529
ADDRESS/PARCEL: 2550 W SWEETWATER DR TUCSON, AZ 85705

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. Please include the water heater in the plumbing fixture schedule. Reference: Section 107.2.1, IBC 2024.
2. What is the purpose of sink S-2? Provide a direct connection to the building drainage system for all plumbing fixtures except as allowed by Chapter 8, IPC 2024. Reference: Section 301.3, IPC 2024.
3. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10 seconds. Reference: Section 604.4, IPC 2024 and Section 606.4, ICC/ANSI A117.1-09
4. Provide a detail of the sump pump from sink S-1 to show the required check valve and the full-open valve on the discharge of the sump pump. Reference: Section 712.2, IPC 2024.
5. Connect the effluent of the sump pump from sink S-1 to the sanitary drain system as described in Section 712.3.5, IPC 2024. An indirect connection to the mop sink, MS-1, is not allowed. Reference: Section 301.3, IPC 2024.
6. Show how tepid water is being supplied to the combination emergency shower and eyewash units. Reference: Section 411.3, IPC 2024.
7. To what does keynotes 14 and 16 on P-201 refer? Reference: Section 107.2.1, IBC 2024.
10/09/2026 Fire New Construction Standard REQUIRES RESUBMIT Resolve building review comments.
Questions: patricia.shelton@tucsonaz.gov
09/25/2026 Site Engineering Standard REQUIRES RESUBMIT Reviewer: John Mounsey – Engineering Associate
Reviewer Contact Information: john.mounsey@tucsonaz.gov

Site Engineering Comments:
1. Site Engineering has completed its review of the submitted plan set and cross-referenced it against the associated development package. However, Site Engineering is unable to grant final approval for Commercial Permit: TC-COM-0926-01529 until the associated revision to Development Package TD-DEV-0926-00240 has received full approval and has been issued. Please resubmit for final approval once the development package has been approved and issued by all applicable reviewers. For final approval - Ensure that all building plans match in regard to footprint, proposed height and square footage with what is shown in the development package plan set.
10/12/2026 Site Zoning Standard REQUIRES RESUBMIT 1. Final Site Zoning approval for this permit cannot be granted until the associated development package, TD-DEV-0926-00240, is first approved.

Contact Site Zoning Lead Planner Fernando Garcia at fernando.garcia2@tusconaz.gov.
09/18/2026 PDSD Application Completeness Express REVIEW COMPLETED