Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0926-01529
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/17/2026 | Commercial Electrical Standard | APPROVED | |||
| 11/19/2026 | Commercial Mechanical Standard | APPROVED | |||
| 11/20/2026 | Commercial Plumbing Standard | APPROVED | 1. Show the required features of the metering faucets for the lavatories. “Complies with local codes” is insufficient. [Initial comment: Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10 seconds. Reference: Section 604.4, IPC 2024 and Section 606.4, ICC/ANSI A117.1-09 2. Neither the required check valve or the shutoff valve are not shown in the detail. [Initial comment: Provide a detail of the sump pump from sink S-1 to show the required check valve and the full-open valve on the discharge of the sump pump. Reference: Section 712.2, IPC 2024. ] 3. See Section 712.3.5, IPC 2024 to see how a pumped waste is to be connected to the sanitary drain. At 10 GPM, a 2” gravity drain pipe is required. Termination into a trench or other indirect waste receiver is not allowed. [Initial comment: Connect the effluent of the sump pump from sink S-1 to the sanitary drain system as described in Section 712.3.5, IPC 2024. An indirect connection to the mop sink, MS-1, is not allowed. Reference: Section 301.3, IPC 2024]. 4. Tempered water is defined as being between 85 F and 110 F. Per Section 411.3, IPC 2024, “Where hot and cold water is supplied to an emergency shower or eyewash station, water temperature of the water supply shall only be controlled by a temperature-actuated mixing valve complying with ASSE 1071.” [Initial comment: Show how tepid water is being supplied to the combination emergency shower and eyewash units. Reference: Section 411.3, IPC 2024.] 5. Comment not resolved; keynote 14 is unchanged. [Initial comment: To what do keynotes 14 and 16 on P-201 refer? Reference: Section 107.2.1, IBC 2024.] 6. New comment: Where does keynote 15 occur on P-201? Reference: Section 107.2.1, IBC 2024. 7. New comment: Revise detail 5/P-502 to show the tank type water heater correctly installed. The detail shall include the excess pressure relief, expansion tank, safety pan, and valves. Reference: Sections 503.1, 504, 606.1, and 607.3, IPC 2024. If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 11/17/2026 | Outdoor Lighting Standard | APPROVED | |||
| 11/17/2026 | Site Engineering Standard | APPROVED | |||
| 11/17/2026 | Site Zoning Standard | APPROVED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Building Standard | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT |