Permit Number: TC-COM-0926-01488
Parcel: 10120036M

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0926-01488
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/09/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/17/2026 Addressing Validation REQUIRES RESUBMIT If you have any questions about this review, please contact us at CDRC@tucsonaz.gov
The project address on this permit application does not match the project address on the plans submitted. Please update the plans and resubmit, or, submit a Request Change of Address if the permit application is incorrect.
How to request a change of address:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/withdraws-and-extensions.pdf
Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf
10/08/2026 Commercial Building Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0926-01488
ADDRESS/PARCEL: (3710 W EL CAMINO DEL CERRO TUCSON, AZ 85745)
Submit your revised drawings along with a ***detailed response letter***, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed.

Should you have any questions about these Commercial Building comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976.

COMMENTS:
1. SEPARATE BUILDING PERMITS: The City of Tucson’s permitting system requires that the Convenience Store and the Gas Station are to be separated into two building permits, one for the Convenience Store and the second for the Gas Station.
a. The city will continue using this building permit number TC-COM-0926-01488 for the Convenience Store. The following will be pasted on the cover sheet. “THIS BUILDING PERMIT TC-COM-0926-01488
IS ONLY FOR THE CONVENIENCE STORE.
(PLEASE SEE SEPARATE BUILDING PERMIT FOR THE GAS STATION.)”
b. Please separate all related drawings/documents from the Convenience Store and apply for a new building permit just for the Gas Station. Please inform the City of Tucson as to the building permit number assigned to this Gas Station.
2. PRE-ENGINEERED METAL BUILDING: Please submit the structural calculation and drawings that are sealed/signed/dated by an Arizona licensed structural engineer. This must be submitted and reviewed prior to issuance of the building permit.
3. Separate permits required for installation/modification of: *All fueling systems (tanks, piping, dispensers, etc) require separate construction and operations permits from TUCSON FIRE DEPARTMENT (TFD), please contact TFD.
4. Obtain ADEQ (Arizona Department of Environmental Quality) approval and submit the document prior to issuance of permit. (The state purpose is to protect public health and the environment from releases (i.e., spills, leaks, emissions, etc.) of petroleum and other regulated hazardous substances into groundwater, surface water or soils)
5. SHEET A1.10 FLOOR PLAN: The turning space shall be a circular space with a 67-inch minimum diameter. ICC A117.1 sec 304.3.1.1 (The floor plan shows 5’-0” ADA CLR., please correct this condition.)
6. SHEET A1.56 A18 Base Detail: Corrosion-resistant weep screed with a minimum vertical attachment flange of 3 1/2 inches shall be provided at or below the foundation plate line on exterior stud walls. The weep screed shall be placed not less than 4 inches above the earth or 2 inches above paved areas and be of a type that will allow trapped water to drain to the exterior of the building. The water-resistive barrier shall lap the attachment flange. The exterior lath shall cover and terminate on the attachment flange of the weep screed. IBC: 2512.1.2
Where doors/landings are located at same level as finish floor slab, provide concrete or CMU foundation curb or other approved means to achieve minimum 2 inch clearance between slab and stucco weep screed. (The drawing indicates ¾ inch, please correct this condition.)
7. SHEET A3.30 TURNING SPACE: The turning space shall be a circular space with a 67-inch minimum diameter. ICC A117.1 sec 304.3.1.1 (The enlarged restroom plan shows 5’-0”, please correct this condition.)
8. Please resubmit.
09/30/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0926-01488 (3710 W EL CAMINO DEL CERRO TUCSON, AZ 85745)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Update Concession General Notes #5, on sheet E2.10, to include the term 'beverage serving' along with the 'Permanent provisions for food preparation or cooking',
2. Update Concession General Notes #5, on sheet E2.10, to include GFCI protection for all appliances as listed in NEC 210.8(D).
3. Show a GFCI [NEC 210.8(E)] receptacle outlet on the same level within 25’ of all indoor electrical panels [NEC 210.63(B)(2)].
4. Provide GFCI protection for all 'Attendant Counter' receptacles per NEC 210.8(B)(3).
5. Provide Emergency shutoff switch: NEC 514.11(A). Show Emergency shut-off switch no less than 20 feet, and no more than 100 feet from the dispensers. Show Emergency shut-off switch radius'. Reference sheet E2.20.
6. Provide a classification and zone drawing, NEC 500.4 & 514.3.
7. Show electrical complies with wiring methods as required in NEC 514.7, NEC 514.8, and Sealing per 514.9.
8. Provide grounding and bonding of the new dispensers per NEC 514.16.
9. Provide GFCI protection for FE-07, on circuit PP2-45 per GFCI, NEC 210.8(D)(12)
10. Provide GFCI protection for all auto/tire inflation machines/compressors per NEC 210.8(D)(4). Reference circuits PP3-20 & 22.
11. Provide complete compliance with the 2024 IECC for the interior and exterior lighting, including sensors and lighting controls as required. (typically COMcheck.).
10/08/2026 Commercial Mechanical Standard REQUIRES RESUBMIT 1. Revise the basis of design (M1.10) to show the currently adopted codes; see A0.10.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Sections C403.1.1 and C403.3.1, IECC 2024 and Section 312.1, IMC 2024.
3. Show that the walk-in cooler and the walk-in freezer meet the efficiency requirements of Tables C403.12.2.1(2) and Table C403.12.2.1(3), IECC 2024. Reference: Section C403.12, IECC 2024.
4. Coordinate the efficiency data used in the COMcheck Mechanical Compliance Certificate with the Rooftop Unit Schedule. Reference: Section 107.2.1, IBC 2024.
5. Verify that the scheduled supply air flowrates for the three rooftop units and the Building Air Balance Calculation match the balancing data shown on the mechanical floor plan, M1.10. Reference: Section 107.2.1, IBC 2024.
6. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces using the current code. Calculation of the required minimum ventilation for air handlers serving multiple zones requires the balancing data (supply CFM) for each zone and the calculations described in Sections 403.3.1.1.2.3.1 through 403.3.1.1.2.3.4, IMC 2024. Reference: Section 403.3.1.1.2.3, IMC 2024.
7. Show the sizes and locations of the cleanouts for the grease ducts. Reference: Section 506.3.8, IMC 2024.
8. Show that the exhaust fan for the Type I hood complies with Sections 506.5.1 through 506.5.5 or is listed and labeled for the application (i.e. UL 705). Reference: Section 506.5, IMC 2024.
9. Verify that the proposed Type I hood is equipped to automatically start the hood exhaust fan when cooking operations commence. Reference: Section 507.1.1, IMC 2024.
10. supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2024.
11. Show that the hood installation complies with Section 507.2.6, IMC 2024 with regard to a smooth, cleanable, non-absorbent, and non-combustible material installed between the hood and the wall and extending 18” beyond the hood.
12. Provide an automatic fuel shutoff device (i.e., for gas-fired or electric cooking appliances) interlocked with the hood fire suppression system. Reference: Section 904.3.3, IFC 2024.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
10/08/2026 Commercial Plumbing Standard REQUIRES RESUBMIT 1. Provide a watertight pan of galvanized steel, aluminum, or other approved material under the water heater with a drain to an approved location. Reference: Section 504.7, IPC 2024.
2. Provide calculations showing how the water service piping has been sized. Provide the proposed size of the water meter. Reference: Sections 603.1, IPC 2024.
3. For the use of PEX tubing, provide a branch tube sizing chart showing the correct size of PEX tubing to be used as a substitute for the copper pipe shown on the drawings. Reference: Sections 303.2 and 604.3, IPC 2024.
4. Revise the tempered water supply to the lavatories so that the distance from the hot water source to the tempered water termination for the public lavatories complies with the requirements of Section C404.5.1, IECC 2024
5. The unsealed civil plan, C-07.0, shows the 6-inch building sewer “connected to existing 60” [public] sewer line”. A 6-inch building sewer can only connect to a manhole in the public sewer, and it is doubtful that Pima County would permit any connection to the 60-inch public sewer. An 8-inch public sewer and manhole, however, is located approximately 200 feet east of the proposed connection to the public sewer.
6. Once the point of connection to the sewer is determined, provide the rim elevation of the next upstream sanitary manhole. Determine the need for a backwater valve per Section 714.1, IPC 2024, as amended by the City of Tucson.
7. Provide separate indirect waste pipes for the ice bin and the ice cuber (Detail A8/P1.00) to protect against cross-contamination or fouling. Reference: Section 802.1.1, IPC 2024.
8. Provide sizing calculations for the gravity grease interceptor. Reference: Section 1003.3, IPC 2024, as amended by the City of Tucson.
9. Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Reference: Section 1003.9, IPC 2024, as amended by the City of Tucson.
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
10/09/2026 Fire New Construction Standard REQUIRES RESUBMIT Resolve building review comments.
Questions: patricia.shelton@tucsonaz.gov
10/09/2026 Landfill Standard REQUIRES RESUBMIT Permittee must review Landfill Ordinance 10037 and determine applicability to the 100 foot or 500-foot proximity to a landfill. https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-22345 The Landfill Ordinance Self-Certification Statement Form must be completed and submitted for approval.
09/29/2026 Outdoor Lighting Standard REQUIRES RESUBMIT Outdoor Lighting Review TC-COM-0926-01488 (3710 W EL CAMINO DEL CERRO TUCSON, AZ 85745)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
Outdoor Lighting Review:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

1. The replacement, relocation and installation of new lighting fixtures requires compliance with the City of Tucson Outdoor Lighting Code.
2. Provide an outdoor lighting plan that meets the requirements of OLC 104.2. Show/locate the different outdoor light sources on your lighting plan, both new and existing. Number the light fixtures on your lighting fixture table and use the same number on your site plan.
3. List the Lighting Area per OLC (typically E3) chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1.
4. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation.
5. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4.
6. Show lamps with a maximum of 3500K color temperature, OLC 402.1.
7. Provide the manufacturer’s specification sheets for the outdoor lighting fixtures. Include the lumen and color temperature values for each outdoor fixture type.
8. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2.

https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf

9. Specify any exceptions used.

10. Provide Curfew lighting controls If applicable Per section 403.
10/05/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TC-COM-0926-01488 (1st Review)
Project: the project is construction of a new convenience store and gas station.
Location: 3170 W EL CAMINO DEL CERRO (Record says 3710)
Review Date: 10/05/2026
Reviewer: John Mounsey – Engineering Associate
Reviewer Contact Information: john.mounsey@tucsonaz.gov

Site Engineering Comments:
1. Site Engineering has completed its review of the submitted plan set and cross-referenced it against the associated development package. However, Site Engineering is unable to fully review and approve permit TC-COM-0926-01488 until the associated Development Package TD-DEV-0726-00193 has been reviewed and approved by all applicable reviewers.
2. Please resubmit for final approval once the development package has been approved and issued by all applicable reviewers. For final approval - Ensure that all building plans match what is shown in the development package plan set.
10/09/2026 Site Zoning Standard REQUIRES RESUBMIT FROM: Olga Salazar
PDSD Zoning Review Section

PROJECT: TC-COM-0926-01488 – TD-DEV-0726-00193
Convenience Store (1st Review)
3710 W El Camino Del Cerro

TRANSMITTAL DATE: October 9, 2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-0726-00193, and although the plans appear to be in compliance, Zoning cannot approve the building plan until the DP has received full approval and has been issued.

2. COMMENT: The total GFA shown on the building permit for the convenience store is 5,830 s.f.; however, TD-DEV-0726-00193 indicates a total GFA of 5,630 s.f. Please correct the information to ensure consistency between the two documents or clarify the discrepancy.

3. COMMENT: Ensure that the proposed heights are consistent with what is shown on the associated DP.

4. COMMENT: More comments may be forthcoming based on the next submittal's response.

If you have any questions about this transmittal, contact Olga Salazar at Olga.Salazar@tucsonaz.gov.
10/08/2026 Water - PDSD Standard REQUIRES RESUBMIT 1. The unsealed civil plan, C-07.0, appears to show the water meter installed on private property. Installation of the water meter is to be 3 feet from the property line, in the right of way (see Tucson Water Standard Detail SD-309). https://www.tucsonaz.gov/files/sharedassets/public/v/1/living-and-working/parks-and-recreation/documents/tucson-water-docs/sd-309_rev.pdf
2. Plan notes 10 and 11 on P1.11 call for the installation of the reduced pressure backflow prevention assembly to be installed within the new building. The installation of the reduced pressure assembly shall be, “…outside, above ground, as close as possible to the water meter or service connection as possible and on private property...” (see Tucson Water Standard Detail SD-1802. https://www.tucsonaz.gov/files/sharedassets/public/v/1/living-and-working/parks-and-recreation/documents/tucson-water-docs/sd-1802.pdf
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
09/17/2026 PDSD Application Completeness Express REVIEW COMPLETED