Permit Number: TC-COM-0925-01694
Parcel: 126164490

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0925-01694
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/17/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/17/2025 Addressing Validation REQUIRES RESUBMIT Site plan missing complete project address. Please update site plan and resubmit. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf
09/17/2025 Commercial Electrical Express REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0925-01694 (333 S ALVERNON WY Unit:UNIT 53 TUCSON, AZ 85711)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Clarify the scope of work by clearly marking on the line diagram which equipment and conductors are being replaced. Permit description mentions a new 100A sub-panel as well.
2. Clarify why the line diagram shows a 200A Breaker feeding panel A, but there is a note indicating that the ‘Breaker Size’ is 100A.
3. Specify which side of the building the sub panel is located at. If the new electrical conductors and conduit, through the attic, passes through the fire wall within the attic, then this will need to be a fire-rated penetration.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
09/17/2025 PDSD Application Completeness Express REVIEW COMPLETED