Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0925-01686
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/29/2025 | Commercial Building | APPROVED | |||
| 09/26/2025 | Commercial Electrical | APPROVED | |||
| 10/07/2025 | Site Zoning | APPROVED | |||
| 09/29/2025 | Water - PDSD | APPROVED | |||
| 10/07/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/29/2025 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Provide detail 107, noted on sheet M1. Reference: Section 107.2.1, IBC 2018. 2. Verify that the proposed kilns are listed and labeled as complying with UL 499. Provide the manufacturer’s installation instructions. Reference: Section 923, IMC 2018. 3. Identify the quantities of glazes and other finishing materials that will be stored (closed and open) or in use. Provide the safety data sheets for the materials and identify the manufacturer’s precautionary statements (e.g. ventilation requirements). 4. Identify any proposed spraying operations of the glazes. |
||
| 09/29/2025 | Commercial Plumbing | REQUIRES RESUBMIT | Verify that the architect understands that the point-of-use water dispenser specified in the plumbing fixture schedule is approved as a substitute for a water fountain while the “bottle drinking fountain” is not an acceptable sole substitute for a water fountain. | ||
| 09/30/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 09/17/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |