Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0925-01658
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/30/2025 | Water - PDSD Standard | APPROVED | |||
| 09/26/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 09/19/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 10/10/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/23/2025 | Commercial Building Standard | REQUIRES RESUBMIT | 1. Structural Calcs, 2024 IBC; In accordance with City of Tucson adopted codes and implentation, the combining of design code editions is not accepted. Design must be specific and exclusive to either 2018 or 2024 edition I-codes. DMA | ||
| 09/23/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | 1. Cover Sheet, 2018 IECC; Provide Building Envelope, Mechanical and Electrical Energy Certificates. DMA | ||
| 09/23/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Cover Sheet, 2024 IBC [A] 107.2.6 Site plan. The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey. Include accessible route, arrival points, and accessible parking. DMA 2. Cover Sheet, 2024 IBC [A] 107.3.4.1 Deferred submittals. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official. DMA |
||
| 09/23/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. AS NOTED Cover Sheet: 2024 IBC [P] 2902.2 Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. Exceptions: 6. Separate toilet facilities shall not be required where rooms having both water closets and lavatory fixtures are designed for use by all persons regardless of sex and privacy is provided for water closets in accordance with Section 405.3.4 of the International Plumbing Code and for urinals in accordance with Section 405.3.5 of the International Plumbing Code. In accordance with this section and as designed and detailed on plans the code Exception is applicable. Field verify that the privacy to water closets is maintained. DMA | ||
| 09/29/2025 | Design Review Standard | REQUIRES RESUBMIT | RNA Design Package being reviewed under SD-0625-00098. | ||
| 10/10/2025 | Historic | REQUIRES RESUBMIT | Update plan set with new front and side elevations. Will require historic review which is scheduled for 10-23-2025 and then another meeting by the DRB afterwards. Sub record # SD-0625-00098 |
||
| 10/10/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Krista Hansen Planning & Development Services Department – Zoning Review Section PROJECT: TC-COM-0925-01658 121 E BROADWAY BL Tenant Improvement (1st Review) TRANSMITTAL DATE: 10/10/2025 This site is zoned OCR-2 (UDC Section 4.7.27). 1. COMMENT: Clarify the Use per UDC Table 4.8-4. 2. COMMENT: Site Zoning has no additional comments. This site is located within the Rio Nuevo Area (RNA), the Infill Incentive District (IID), and is a contributing historic structure. Zoning cannot approve this permit application until review and approval by the Design Review Board and Historic (SD-0625-00098). RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Correct plans and a response letter indicating how Site Zoning comments were addressed. For questions regarding Zoning comments, please contact me at: Krista.Hansen@tucsonaz.gov |
||
| 09/30/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 09/11/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |