Permit Number: TC-COM-0925-01614
Parcel: 14111002D

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0925-01614
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/29/2026 Commercial Building Standard APPROVED
01/14/2026 Site Engineering Standard APPROVED
01/28/2026 Site Zoning Standard APPROVED Approved with TD-DEV-0924-00245
01/29/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/29/2026 Commercial Plumbing Standard REQUIRES RESUBMIT If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
1. Both the development plan and plumbing plan now show a ¾” water meter and a 1” water service to building 22. The development plan, however, now shows a ¾” backflow preventer while the plumbing plan shows a 1” backflow preventer. Coordinate the drawings. [Initial comment: Verify the size of the water service to the building and the backflow preventer. The development plan shows a 2” water service and a 2” backflow preventer while the site plan and plumbing plan show a 1” water service and a 1” backflow preventer. Reference: Section 107.2.1, IBC 2018.]
2. The revised development plan and the revised plumbing plan now show a backwater valve in the building sewer. The rim elevation of the next upstream sanitary manhole (2858.5) is 12” or more than below the first-floor elevation (2860.60). A backwater valve shall not be installed per Section 714.1, IPC 2018, as amended by the City of Tucson.
01/07/2026 PDSD Application Completeness Express REVIEW COMPLETED