Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0924-01857
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/09/2024 | Commercial Building | APPROVED | |||
10/11/2024 | Site Engineering | APPROVED | |||
10/03/2024 | Site Zoning | APPROVED | |||
10/08/2024 | Water - PDSD | APPROVED | |||
10/11/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/08/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 The instantaneous water heater requires 80 amps at 208 volts. See Plumbing Water Heater schedule, plan sheet ‘P2’. The electrical power plan and panel schedule calls for a 20-amp OCPD. Revise the electrical to meet the requirements. 2 Provide compliance with the 2018 IECC for the lighting. Ref; 2018 IBC section 107.2.1, 2017 NEC, 2018 IECC. |
||
10/09/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. The Outside Air Ventilation Schedule calls for 139 CFM of exhaust for the Scalp room (0.5 CFM/square foot) but no such exhaust is shown on the mechanical drawing. What is the basis for the ventilation calculations and why isn’t the exhaust shown on the drawing? 2. The alcove for the washer/dryer has what appears to be an unscheduled folding door. Clarify the nature of this door and verify that there is adequate make-up air for the dryer. Reference: Section 504.6, IMC 2018. |
||
10/09/2024 | Commercial Plumbing | REQUIRES RESUBMIT | Clarify the installation of the three “shampoo chairs”: the manufacturer’s data (sheet 9.1) shows cold and hot water connections and a drain connection. Will there be any plumbing connections associated with the chairs? Reference: Section 107.2.1, IBC 2018. | ||
09/30/2024 | Fire New Construction | REVIEW COMPLETED | |||
09/26/2024 | PDSD Application Completeness | REVIEW COMPLETED |