Permit Number: TC-COM-0924-01812
Parcel: 11207461C

Address:
2921 E GRANT RD

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.1

Permit Number - TC-COM-0924-01812
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/02/2024 Commercial Electrical APPROVED
10/01/2024 Commercial Mechanical APPROVED
10/01/2024 Commercial Plumbing APPROVED
10/04/2024 Site Engineering APPROVED
10/01/2024 Site Zoning APPROVED
10/01/2024 Water - PDSD APPROVED
10/04/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
10/01/2024 Commercial Building REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0924-01812
ADDRESS/PARCEL: (2921 E GRANT RD TUCSON, AZ 85716)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter.
COMMENTS:
1. Please provide the clear opening of the door at the New Restroom or provide a Door Schedule for all the doors.
2. The New Restroom door does not have the 18 inch clearance required for a front approach-pull side configuration as shown on your exhibit on sheet A7, configuration (a). Or simply pull the entire restroom to the frond end of the hallway, thereby there would be over 18” clearance as well as providing a more generous kitchen space in the back, killing 2 issues with one stone.
3. Similarly with item #2 above, the back door does not have the necessary pull clearance of 18 inches between the door opening and the mop sink. This can be reduced to 12 inches using the push configuration by changing the swing in the direction of travel as required by the building code.
4. Please resubmit.
09/24/2024 Fire New Construction REVIEW COMPLETED
09/19/2024 PDSD Application Completeness REVIEW COMPLETED