Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0924-01789
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/16/2024 | Commercial Electrical | APPROVED | |||
| 09/16/2024 | Commercial Structural | APPROVED | Please NOTE: we are approving this portion of the project, however there are 2 suites involved, a second permit has been created for this suite 108. Please do make sure to complete the process for both permits. | ||
| 09/17/2024 | Site Zoning | APPROVED | |||
| 09/16/2024 | Commercial Plumbing | NOT REQUIRED | |||
| 09/16/2024 | Site Engineering | NOT REQUIRED | |||
| 09/17/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/16/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC unit. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 2. Revise the mechanical design as required to avoid using the corridor as a return air duct. Reference: Section 601.2, IMC 2018. |
||
| 09/16/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 09/16/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |