Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0924-01761
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/10/2025 | Water Sterilization Report (Deferred Submittal) Express | APPROVED | |||
| 03/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/10/2025 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | The revise air balance report shows that the outside air flow rate is still 23% below the requirement. [Initial comment: The air balance report shows that the existing fan coil unit does not provide the required ventilation for the assembly occupancy. Revise the plans as needed to provide the necessary outside airflow to the space. Reference: Sections 401.2 and 401.3, IMC 2018.] | ||
| 03/12/2025 | County Health Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 03/07/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |