Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0924-01750
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/07/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
02/07/2025 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 2/4/2025 1:09:52 PM 1. (UNRESOLVED) - General - Provide Heat Load Calculations. Heat Load Calculations must match Design on plans. - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads. i. Grease Hood plans show a 2288 CFM KEF (Kitchen Exhaust Fan). Show on the Heat Load calculations the makeup air CFM heat load. Ventilation calculations are not stating the KEF CFM. - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads. - 2018 IBC – Section [A]107.2.1Information on construction documents. - 2018 IECC Section C103.2Information on construction documents. ii. Provide an Air Balance schedule. - 2018 IMC Section 508.1.1 Makeup air temperature. - 2018 IMC Section 508.1.2 Air Balance Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 2/6/2025 8:43:09 PM |
||
02/03/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |