Permit Number: TC-COM-0924-01720
Parcel: 13317062H

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0924-01720
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/27/2024 Commercial Building APPROVED
09/27/2024 Commercial Electrical APPROVED
09/27/2024 Commercial Mechanical APPROVED
09/27/2024 Commercial Plumbing APPROVED
10/02/2024 Site Zoning APPROVED
10/01/2024 Water - PDSD APPROVED
10/07/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/07/2024 Site Engineering REQUIRES RESUBMIT This project is within a COT regulated floodplain and requires a Floodplain Use Permit (FUP). Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home

Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”

NOTE: Documentation of a cost estimate will be required. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor.

Chris Arrington
chris.arrington@tucsonaz.gov
10/03/2024 Fire New Construction REVIEW COMPLETED
09/16/2024 PDSD Application Completeness Express REVIEW COMPLETED