Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0924-01708
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/01/2024 | Site Engineering | APPROVED | |||
10/01/2024 | Site Zoning | APPROVED | |||
10/01/2024 | Water - PDSD | APPROVED | |||
10/01/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/23/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved with Comments Reason: Date Completed : 9/21/2024 5:54:40 PM 1. GENERAL - DEFERRED SUBMITTAL REQUIREMENTS: Reviewer understands that design of the High Pile Racking referenced on Sheet A02.1 Plan Notes 9 & 11 shall be completed by a specialty engineer as a deferred submittal. Please note that IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. The IBC further requires the following procedure be followed when permitting deferred submittals: i. All submittals shall first be reviewed by design professional in responsible charge. ii. Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. iii. They shall then be submitted for review by the building official. iv. No structural elements shall be installed until approved by building official. ◦ Please note that a certificate of occupancy for the new tenant space may be withheld until all the above steps have been completed Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 9/12/2024 7:28:12 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 9/23/2024 9:39:41 AM 1. General - Provide Heat Load calculations - 2018 IECC Section C403.2.1 Calculation of heating and cooling loads 2. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements. 3. General - Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space. - 2018 IMC Section 403, Table 403.3.1.1 - ASHRAE Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 9/13/2024 5:52:41 PM 1. E-201 is missing S2 security note (S2 is used in multiple locations). 2. E-201 could not locate Power Key Notes 10 and 18. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved with Comments Reason: Date Completed : 9/10/2024 10:55:03 PM First Plumbing Review: OK Subject to Field Inspections |
||
09/16/2024 | Fire New Construction | REVIEW COMPLETED | |||
09/09/2024 | PDSD Application Completeness | REVIEW COMPLETED |