Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0924-01706
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/20/2024 | Commercial Structural | APPROVED | |||
| 12/06/2024 | Site Zoning | APPROVED | |||
| 12/06/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/27/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. Thank you for the scope of electrical work clarification as requested per the previous electrical review comment. This electrical plan review generated the following comments; 1. Provide plans and evidence on the plans that the proposed exterior lighting fully complies with the Outdoor Lighting Code. See section 104 for plan submittal requirements. 2. Provide complete site lighting plans that show the locations and identifications of each luminaire. 2(a). Provide a complete luminaire schedule that correlates with the lumen calculations and luminaires shown in the Site Lighting Plan. 2(b). Full compliance with sections 104.2.1(1), (2), (3). 2(c). See table 401.1, Include parcel size, lighting area and option, and indicate this information in the lighting site plan. Per the Pima county assessor's information, the parcel size is 2.10 acres. The lumen calculations show 2.27 acres. Please clarify and revise the lumen calculations where necessary. 2(d). 402.1 (light source color temperature requirements, 3500K), shielding requirements, etc . 2(e). Provide calcs for total lumens allowed and total lumens proposed per acre for Full Cut Off and Unshielded per table 401.1. Must include all existing to remain lighting. 2(f). Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. 2(g). Specify any exceptions used. 2(h). Provide Curfew lighting controls If applicable Per section 403. 3. Previous electrical plan review comment #2 was not completely addressed. 3(a). Ref; power and lighting plans. Are panels ‘MDP-2A’,’MDP-2B' new or existing? Please identify accurately. 4. Ref; Electrical Line Diagram. Are panels ‘MDP-2A’,’MDP-2B' new or existing? Please identify accurately. 5. Are the Unit sub-panels new or existing? Indicate this on the plans. 6. Provide complete compliance NEC art’s 210.8 and 210.12 for GFI and Combination Arc Fault protection of branch circuits and personal. Be advised, due to the nature of these review comments and necessary required changes or corrections in order to clarify the scope of work, additional review comments may be generated at the subsequent review. Ref; 2018 IBC section 107.2.1, 2017 NEC, 2018 IECC, 2012 City of Tucson Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements. |
||
| 11/25/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Mechanical ventilation of residential occupancies is mandatory. Reference: Section R403.6, IECC 2018. [initial comment: Replacement of a PTAC unit constitutes new work. Provide specifications for the proposed new units (e.g., Manufacturer, model, SEER2, HSPF2, etc.). Provide ventilation per Section 403.3.1, IMC 2018.] | ||
| 11/25/2024 | Commercial Plumbing | REQUIRES RESUBMIT | The internal diameter of PEX is smaller than the copper tubing. Provide a chart showing the correct size of PEX tubing to be used as a substitute for the copper pipe shown on the drawings [Initial comment: For the use of PEX tubing, provide a branch tube sizing chart showing the correct size of PEX tubing to be used as a substitute for the copper pipe shown on the drawings. Reference: Sections 303.2 and 604.3, IPC 2018.] | ||
| 11/22/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 11/13/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |