Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0923-02312
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/19/2023 | Site Zoning | APPROVED | |||
| 10/27/2023 | Water - PDSD | APPROVED | |||
| 10/18/2023 | Site Engineering | NOT REQUIRED | |||
| 10/27/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/04/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural N/A Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/3/2023 10:53:05 AM 1) Sheet A0.1 (Cover Sheet): Include the allowed vs actual building area, height, and number of stories. (2018 IBC Chapter 5) 2) Sheet A0.3 (Occupancy Load Calculations): Many areas are not included in the occupancy calculations. Mechanical rooms and storage rooms are to be calculated at 1 person per 300 sf of gross area. The business rooms and spaces are to be calculated at 1 person per 150 sf of gross area. The training rooms and open office on the first floor are assembly areas and are to be calculated at 1 person per 15 sf and 1 per 7 sf. The gross floor area is to include the corridors, stairways, closets, and interior walls. (2018 IBC Table 1004.5, Chapter 2 definition of Floor Area, Gross) 3) Sheet A0.3 (Occupancy Load Calculations): Include the calculations for the minimum required number of plumbing fixtures and actual existing fixtures available. (2018 IEBC section 106.1) 4) Sheet A2.1 (Floor Plans): Include the new or existing accessible route and accessibility details of the men's and women's toilet rooms and the locker room. If the existing men's and women's toilet rooms are not accessible, show the details for the new or existing directional signage to the accessible toilet rooms. (2018 IEBC sections 305.7, 305.8.10) 5) Sheets A3.1 and A3.2 (Lighting Plans): Show the new or existing means of egress and emergency lighting. (2018 IEBC 805.7 and 2018 IBC section 1008, 1008.3) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/3/2023 10:54:31 AM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/3/2023 10:54:14 AM See the building review comments. Plumbing N/A |
||
| 10/18/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 10/02/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |