Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0923-02300
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/11/2023 | Site Zoning | APPROVED | |||
10/18/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/18/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/16/2023 1:08:28 PM See the building review comments. No structural revisions are needed at this time. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/16/2023 1:06:51 PM 1) Sheet C2 (Occupancy Calculation): The waiting and break rooms are areas of assembly and need to be calculated at 1person per 15sf for tables and chairs, 1 person per 7sf for chairs only. Please revise the occupant load calculations. (2018 IBC section 1004) 2) Sheets S1 and S2 (Ramp Drawings): Show the dimensions and details for the maneuvering clearance at the top landing of the ramp. (2009 ICC A117.1 sections 405.7.5, 404.2.3, 404.3.2) 3) Sheets S1 and S2 (Ramp Drawings): Missing the ramp edge protection meeting the requirements of 2009 ICC A117.1 section 405.9. 4) Sheets S1 and S2 (Ramp Drawings): The ramp footings are not shown a minimum of 12" deep as required by 2018 IBC section 1809.4. Some railing posts are shown extending through the slab. 5) Sheets A2.1 and A2.2 (Accessibility Details): Show the accessible toilet room signage locations and details. (2009 ICC A117.1 sections 703, 703.3.11) 6) Sheet A2.0 (Floor Plan): Include the ramps on the floor plans. (2018 IBC section 107) Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/16/2023 1:07:58 PM See the building review comments. No electrical revisions are needed at this time. Mechanical N/A Plumbing N/A |
||
10/18/2023 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Lianne Evans at lianne.evans@tucsonaz.gov or Stephen Blood at Stephen.Blood@tucsonaz.gov if you have any questions about the FUP. |
||
10/13/2023 | Fire New Construction | REVIEW COMPLETED | |||
09/28/2023 | PDSD Application Completeness | REVIEW COMPLETED |