Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0923-02299
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/26/2023 | Commercial Plumbing | APPROVED | |||
| 10/31/2023 | Commercial Structural | APPROVED | |||
| 10/11/2023 | Site Zoning | APPROVED | |||
| 10/18/2023 | Site Engineering | NOT REQUIRED | |||
| 10/31/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/24/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1. Please show the complete electrical after all the structural work is complete. 2. Designate branch circuits and panels for all the power and lighting on the electrical floor plans and correlate with the Panel schedule.. 3. Show the location of the breaker panel associated with the electrical work and provide a complete panel schedule. 4. Identify all new and or relocated electrical devices and lighting. If new luminaires are installed, provide a complete luminaire schedule. Ref; 2018 IBC section 107.2.1, 2017 NEC |
||
| 10/12/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 09/28/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |