Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0923-02299
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/26/2023 Commercial Plumbing APPROVED
10/31/2023 Commercial Structural APPROVED
10/11/2023 Site Zoning APPROVED
10/18/2023 Site Engineering NOT REQUIRED
10/31/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/24/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1. Please show the complete electrical after all the structural work is complete.

2. Designate branch circuits and panels for all the power and lighting on the electrical floor plans and correlate with the Panel schedule..

3. Show the location of the breaker panel associated with the electrical work and provide a complete panel schedule.

4. Identify all new and or relocated electrical devices and lighting. If new luminaires are installed, provide a complete luminaire schedule.

Ref; 2018 IBC section 107.2.1, 2017 NEC
10/12/2023 Fire New Construction REVIEW COMPLETED
09/28/2023 PDSD Application Completeness Express REVIEW COMPLETED