Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0923-02266
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/25/2023 | Water - PDSD | APPROVED | |||
10/25/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/18/2023 | Site Engineering | REQUIRES RESUBMIT | See Zoning comment | ||
10/17/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0923-02266 1875 S. Alvernon Wy. – C-2 Food Service – Reconfiguration of Exterior Area (1st Review) TRANSMITTAL: October 17, 2023 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in C-2 zone (UDC 4.7.21), Food Service: Excluding Soup Kitchens is a permitted use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.4.M.1 and 4.9.13.P. 1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
09/29/2023 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 9/29/2023 12:40:10 PM Plans are approved. Subject to the field inspector's approval. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 9/29/2023 12:38:50 PM Plans are approved. Subject to the field inspector's approval. Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 9/29/2023 12:39:29 PM Plans are approved. Subject to the field inspector's approval. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 9/29/2023 12:39:12 PM Plans are approved. Subject to the field inspector's approval. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 9/29/2023 12:39:53 PM Plans are approved. Subject to the field inspector's approval. |
||
10/02/2023 | Fire New Construction | REVIEW COMPLETED | |||
09/26/2023 | PDSD Application Completeness | REVIEW COMPLETED |