Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0923-02253
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/28/2023 | Commercial Plumbing | NOT REQUIRED | |||
| 09/28/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/28/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Replacement of commercial AC units constitutes new work so the submittal will require a heating/cooling load calculation to justify the capacities of the units being installed (Sections C403.3.1 and C403.2.2, IECC 2018). The units themselves will also have to comply with Sections C403.3.2, C403.4 and C403.5, IECC 2018 for efficiency, controls, and economizers. While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. Reference: Section C503.4, IECC 2018. 2. Note: New heating /cooling loads are not required for emergency replacement of cooling and heating equipment where there are no alterations, additions, or changes of occupancy, the equipment does not increase in capacity, and the equipment being replaced was installed prior to January 1, 2013. |
||
| 09/21/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |