Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0923-02245
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/26/2023 | Site Zoning | APPROVED | |||
10/18/2023 | Site Engineering | NOT REQUIRED | |||
10/24/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/18/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. The scope of work submitted states,” CODE VIOLATION, BUILT W/O PERMIT. REPLCED TO ROOF MOUNT AC. ADDED WALK COOLER AND RELOCATED SALES COUNTER”. 1. Designate branch circuit and breaker panels for all new or replaced electrical equipment and appliances and correlated with complete panel schedules. Ref; 2018 IBC section 107.2.1, 2017 NEC |
||
10/23/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 2. Show that the proposed replacement rooftop unit meets the requirements of Sections C403.3, C403.4, and C403.5 (e.g. provide the mechanical compliance certification from COMcheck). Reference: Section C501.4, International Energy Conservation Code 2018. 3. Provide data to show that the construction and refrigeration equipment performance of the new walk-in coolers complies with the requirements of Section 403.10, IECC 2018. 4. The mechanical plan, M1.0, shows two split system AC units and one rooftop packaged AC unit. Why are only two units listed in the ventilation schedule? Reference: Section 107.2.1, IBC 2018. 5. Show the size, routing, and termination of the condensate drains for the new rooftop packaged AC unit. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. 6. Provide the Type and quantity of refrigerant used for the walk-in coolers. Determine the need for any refrigerant detection and alarm system. Reference: Sections 1102.1, 1103.2 (4), 1103.3, and 1104.1, IMC 2018. |
||
10/24/2023 | Commercial Structural | REQUIRES RESUBMIT | submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. Submit a complete set of Architectural Drawings to include wall details, cooler/freezer details, counter details, etc. 2. Locate/label service sink on the floor plan. 3. Lights within the coolers, Lighted exit sign, emergency lights w/ battery backup, fire extinguisher, dedicated security light, etc are not shown in any of the drawings (you indicated they are shown in the electrical drawing). Please show these on your drawing. 4. Locate cashier equipment & the associated electrical power, locate/label soda machine containing the water source for the drinking fountain, etc. 5. Please resubmit. |
||
10/19/2023 | Fire New Construction | REVIEW COMPLETED | |||
09/21/2023 | PDSD Application Completeness | REVIEW COMPLETED |