Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0923-02230
Parcel: 12908021J

Address:
1710 E 22ND ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0923-02230
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/21/2023 Commercial Electrical APPROVED
09/26/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/26/2023 Commercial Plumbing REQUIRES RESUBMIT 1. Show the location of the reduced pressure backflow assembly on the drawings; indicate the size of the assembly. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf.
2. Identify the material used for the water service piping and fittings. Reference: Sections 605.3 and 605.4, IPC 2018.
3. Provide a full-open valve for the water service at each building entrance. Reference: Section 606.1(2), IPC 2018.
4. Provide specifications and details for the ice and water station (e.g. will an ice maker be installed, with backflow protection?). Reference: Sections 608.1 and 608.3, IPC 2018 and Section 107.2.1, IBC 2018.
5. Clarify the civil site plan, showing the route of the building sewer to the public sewer and the connection to the public sewer. Reference: Section 107.2.1, IBC 2018.
6. Specify the material of construction for the building sewer pipes. Reference: Sections 702.1 and 702.2, IPC 2018.
7. Provide cleanouts for the building sewer; the cleanouts shall not be located greater than 100-feet apart, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Section 708.1.2, IPC 2018.
8. Provide the rim elevation of the next upstream sanitary manhole and the first-floor elevations for the trailers. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.
09/26/2023 Site Zoning REQUIRES RESUBMIT All commercial sites where development is proposed require an approved Development Package before the building plans can be approved.

Please apply for a Development Package that is compliant with 2-06 of the city of Tucson Administrative Manual.

For more information, please refer to the city of Tucson Planning and Development Services website: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Development-Package

Alternatively, you may inquire if the City Manager can waive the DP process. For any questions regarding this transmittal, please contact nicholas.martell@tucsonaz.gov
09/19/2023 PDSD Application Completeness Express REVIEW COMPLETED