Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESTAMP - COMMERCIAL v.1
Permit Number - TC-COM-0923-02209
Review Name: RESTAMP - COMMERCIAL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/30/2024 | Commercial Building | APPROVED | |||
| 04/29/2024 | Commercial Mechanical | APPROVED | |||
| 04/30/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/25/2024 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review PROJECT: TC-COM-0923-02209 3920 E FORT LOWELL RD. – C-1 TI - Administrative and Professional Office (1st Review) TRANSMITTAL DATE: April 25, 2024 Please resubmit revised drawings with a detailed response letter stating how all Zoning Review Section comments were addressed. The site is in the C-1 zone (UDC 4.7.20). Administrative and Professional Office use is a permitted use in the zone (UDC Table 4.8-4), subject to Use Specific Standard 4.9.13.O. 1. Based on aerial photos there has been exterior gates added at the north end of the vehicle use area. Zoning was not able to find approved documents for these gates Either provide approved documents for these gates or per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. The DP shall include the changes to accessible parking shown on the plan . If you have any questions about this transmittal, contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. . |
||
| 04/24/2024 | Fire New Construction | REVIEW COMPLETED |