Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0923-02153
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/26/2024 | Site Engineering | APPROVED | |||
| 08/21/2024 | Site Zoning | APPROVED | |||
| 08/26/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/31/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 7/28/2024 2:13:53 PM 1. E301 Per City of Tucson Commercial Submittal Requirements, “A Registered Electrical Engineer is required when electrical designs exceed 400 amps, and where the available fault current at any new piece of equipment exceeds 22,000 amps, or for hazardous locations, hospitals or buildings with operating rooms.” The new equipment is fed from a new 800 amp fused disconnect ie ampacity exceeds 400 amps. 2. E301 Panel P2 circuit 38, 40, 42 may have an undersized circuit breaker for the load. Suggest to upsize if required. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 7/30/2024 8:58:35 PM First Plumbing Review: 1). Plan Page P101 D: Missing Sanitary vent for 4" Bldg Drain. Add sanitary vent thru roof level in accordance with -2018 IPC 901.2.1, 904.1 2). Plan Page P101 D: Plans not clear of the use of the 3" Bldg drain.? -2018 IPC 106.3.1 3). Plan Page P101 D: plans not illustrating the continuation of the water piping to the hose faucet with shut off valve & vacuum breaker along with pipe sizing & material specifications. -2018 IPC 106.3.1, 604.3, 606.2, 608 4). Plan Page P101 D: missing bldg drain cleanouts. Add bldg drain cleanouts in accordance with 2018 IPC 708.1 5). Plan Page P101 D: missing oil separator vent. Keynote P2 states reclaim tank has built in oil separator add a oil separator vent. -2018 IPC 1003.9 6). General: What is the use of the reclaim tank? & where will its contents be piped? 2018 IPC 1304 |
||
| 08/22/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 07/24/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |