Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0923-02153
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/15/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/14/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0923-02153 – TD-DEV-0923-00388 4995 N. Casa Garnde Hy. – I-1/I-2 Tenant fit-out of a new United Rentals business - BLDG 1 & BLDG 3 (3rd Review) TRANSMITTAL: December 14, 2023 Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in I-1& I-2 Zones (UDC 4.7.29). Contractor's Equipment Rental is an allowed use in the zone, subject to Use Specific Standard 4.9.13.Q. 1. Zoning has reviewed the building plans for compliance with development (DP) TD-DEV-0923-00388 and although it appears the plans match until the DP is reviewed and approved by all review agencies Zoning cannot approve this building plan set. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 12/15/2023 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Approved with Comments Reason: Date Completed : 9/18/2023 5:42:42 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/15/2023 11:10:43 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 12/11/2023 5:01:50 PM 2nd Review 1. Plan sheet H-001 indicates on the Split Fan Coil Unit Schedule, Location FCU-3 Location Bldg. 2 - RM 113 Restroom Type Wall. Plan Sheet H101b shows FCU-3 in Rm 102 Women's Locker Room. Restroom 113 has a 4" - 70 CFM supply drop from EX-AHU 2. Confirm location to Split Fan Coil Unit Schedule. 2018 IBC – Section [A]107.2.1 Information on construction documents.(RESOLVED) 2. Plan sheet H-101b identifies EX-Condensers for AHU-1 and AHU-2 as EX-Cond 5 and EX-Cond 6. Plan sheet H-001 on the Air Cooled Heat Pump Schedule identifies EX C-1 and EX C-2 as the condensers for AHU-1 and AHU-2. Confirm condenser identification. 2018 IBC Section [A]107.2.1 Information on construction documents. (RESOLVED) Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 9/19/2023 6:42:15 PM Electrical Review of United Rentals By: Ron Ross PE Comment only: Sheets not submitted in order shown on sheet index. SE-101 Site Lighting & Electrical Plan: Comment only, Keynote 1’s circuits seem small for application. Could not locate Keynote 2. E-201a Electrical Floor Plan - Building 1: One of the Power & Data Keynote’s E2 seem to be pointing to an interior TV, not a building sign. Missing Keynote E10. E-201b Electrical Floor Plans - Building 2: Could not locate Keynotes E2 and E3. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved with Comments Reason: Date Completed : 12/13/2023 11:30:42 PM Third Plumbing review: Ok Subject To Field Inspections 1).Resolved- Plan page P-101a needs to illustrate the sanitary, venting, water piping configurations for the added drinking fountains & emergency eyewash stations. -IPC 106.3.1, 604.3, 901.2.1 2). Resolved-Plan page P-101b needs to illustrate the sanitary, venting, water piping configurations for the added drinking fountains, sk-1 sink, urinal, second floor rest room, & emergency eyewash station. -IPC 106.3.1, 604.3, 901.2.1 3). Resolved-Plan page P-101c oil interceptor needs to be vented -IPC 1003.9 4). Resolved-Pressure washer water connection needs backflow protection. on plan page P-101a -IPC 608.1 **Needs to be located on dedicated water line to device**Subject To Field Inspections 5). Resolved-add oil interceptor sizing calculations to plan page P-101c -IPC 1003.4.2.2 6). Resolved- Lavatories on plan page P-001 need ASSE 1070 mixing valves -IPC 419.5 7).Resolved-Plumbing plans need to include complete piping illustrations -IPC 106.3.1 |
||
| 12/11/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |