Permit Number: TC-COM-0923-02134
Parcel: 11103064F

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0923-02134
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/21/2023 Commercial Electrical APPROVED
09/21/2023 Commercial Mechanical APPROVED
10/09/2023 Commercial Structural APPROVED
09/05/2023 Site Zoning APPROVED
09/14/2023 Site Engineering NOT REQUIRED
10/09/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/21/2023 Commercial Plumbing REQUIRES RESUBMIT 1. Revise the hot water supply to the new lavatory so that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018 (e.g. 24” for ½” pipe, 6” for ¾” pipe).
2. Show the location of the required drinking fountain (or point-of-use water dispenser). Reference: Section 2902.1, IBC 2018.
09/21/2023 Water - PDSD REQUIRES RESUBMIT 1. Show the location of the reduced pressure backflow assembly on the drawings; indicate the size of the assembly. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf
2. Provide the basis for the fixture unit and water demand calculations or use Tables E103.3(2) and E103.3(3), IPC 2018 to estimate the water demand. The minimum water service pipe is ¾”; the site plan on sheet CVR shows a 1” water service pipe, not a 5/8” pipe. Reference: Sections 603.1 and 604.1, IPC 2018.
09/11/2023 Fire New Construction REVIEW COMPLETED
09/05/2023 PDSD Application Completeness Express REVIEW COMPLETED