Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0923-02127
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/27/2023 | Site Zoning | APPROVED | |||
10/03/2023 | Water - PDSD | APPROVED | |||
09/13/2023 | Site Engineering | NOT REQUIRED | |||
10/03/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/07/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/7/2023 2:17:30 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/7/2023 2:15:56 PM 1) General: Include the calculations for the minimum number of toilet room & drinking fountain plumbing fixtures and the separate facilities for the number of occupants served by the toilet rooms. The women's toilet room is being removed. (2018 IPC section 403) 2 Sheet EP101 (Electrical Power Drawings): Panel "P1" is detailed as existing but is shown on a new wall of the addition. Please include the panel schedule and include it on the one-line diagram on sheet EP701. (2018 IEBC section 106) 3) Sheet EP101 (Electrical Power Drawings): Device labeled #5 is detailed as existing but is shown on a new wall of the addition. (2018 IEBC section 106) 4) Sheet EP701 (Electrical Schedules and One-Line Diagram): Show the new or existing earth ground at the separate building. (2017 NEC section 250.32) 5) Sheet EP701 (Electrical Schedules and One-Line Diagram): The one-line diagram shows the subpanels are fed with 4 conductors along with a ground - the panel schedules show the service is 120/240V single phase. Please coordinate the Wire & Conduit Schedule with the service and feeder conductors. (2018 IEBC section 106) 6) Sheet m2.01 (Mechanical Equipment Schedules): The schedules show the HVAC equipment is 208V but the electrical sheets show that the service is 120/240V. Please coordinate the mechanical and electrical details. (2018 IEBC section 106) 7) Sheet m2.01 (Mechanical Equipment Schedules): Include the air balancing/combustion air calculations and the dryer specifications for the BTU's and exhaust CFM. (2018 IFGC section 614.6, 304) 8) Sheet a2.01 (Elevation Views): Show the dryer exhaust vents and their distances to the building openings and intakes. (2018 IFGC section 501.3) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/7/2023 2:17:00 PM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/7/2023 2:16:39 PM See the building review comments Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/7/2023 2:17:15 PM See the building review comments. |
||
09/11/2023 | Fire New Construction | REVIEW COMPLETED | |||
09/01/2023 | PDSD Application Completeness | REVIEW COMPLETED |