Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0923-02126
Parcel: 10821018Y

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0923-02126
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/04/2023 Commercial Structural APPROVED
09/06/2023 Site Zoning APPROVED
09/14/2023 Site Engineering NOT REQUIRED
10/04/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/27/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response
1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements
10/03/2023 Commercial Mechanical REQUIRES RESUBMIT Specify the new exhaust fan and state the exhaust flow rate. Ventilation for restrooms in public spaces requires a minimum of 50 CFM of mechanical exhaust per water closet or urinal if the exhaust is continuous and 70 CFM if the exhaust is intermittent. Reference: footnote e, Table 403.3.1.1, IMC 2018.
10/03/2023 Commercial Plumbing REQUIRES RESUBMIT 1. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2018.
2. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
3. Provide tempered water for the lavatory using an approved device conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018.
4. Verify that the distance from the hot water source to the hot water termination for the lavatory complies with the requirements of Section C404.5, IECC 2018.
09/11/2023 Fire New Construction REVIEW COMPLETED
09/01/2023 PDSD Application Completeness Express REVIEW COMPLETED