Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0826-01413
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/31/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/31/2026 | Commercial Electrical Express | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0826-01413 (300 S TUCSON BL Unit:BLDG 5 TUCSON, AZ 85716) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Provide an electrical riser diagram, NEC 230.9. Include underground service entrance conductors/conduit. a. Show each meter and address/unit associated with each meter. b. Provide a line diagram showing the new equipment being added or modified, NEC 110.2, 2018 IBC 107.1. c. Show bus bar or equipment rating and AIC ratings of the new equipment. d. Highlight the parts, conductors, equipment, etc, being repaired. Provide sizing and other info as needed to verify code compliance. 2. The addition of an additional meter will require additional information. Demonstrate compliance with NEC 230.2 (Number of Services). May require written consent from the Building Official through appeal. 3. Provide an electrical panel schedule and clarify if this building was fed from a separate existing meter and now will have its own independent meter/service. NEC arts;300 and 408.4. IBC 107.1. 4. Provide electrical load calculations, for the Main Service Panel, Per NEC 220.40. 5. Show all wiring methods in detail for all new or modified branch circuit conductors and feeders. Conductor type and conduit size/type. Note wet use requirements. NEC arts;300 and 408.4. |
||
| 08/31/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |