Permit Number: TC-COM-0826-01409
Parcel: 13216627A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0826-01409
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/16/2026 Commercial Building Standard APPROVED
11/02/2026 Site Engineering Standard APPROVED
11/16/2026 Water - PDSD Standard APPROVED
11/16/2026 Commercial Post Review Express PENDING ASSIGNMENT
10/23/2026 Addressing Validation REQUIRES RESUBMIT If you have any questions, please contact cdrc@tucsonaz.gov

The address on the associated development package is 4502 S CAMPBELL AV, which is different than the address on this permit. Please submit change of address request for this permit to correct address. When this review is complete, please resubmit documents with the address 4502 S CAMPBELL AV included on all pages.

Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf

Instructions can be found here to request change of address: https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/sub-records.pdf
11/16/2026 Commercial Mechanical Standard REQUIRES RESUBMIT Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or below grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2024, as amended by the City of Tucson.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
11/16/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Correct the Indirect waste schedule in detail 6/P2.01per Section 802.3, IPC 2024.
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
11/16/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Jeffrey W. Cassidy, Planner I
Planning & Development Services Department – Current Zoning Review Section, Commercial

PROJECT:
TC-COM-0826-01409 – Commercial – New Maverick Convenience store
4502 S CAMPBELL AV TUCSON, AZ 85714 (C-2 Zoning)
Commercial Building Plan Review – 2nd Review

TRANSMITTAL DATE:
November 16, 2026

1. COMMENT: Address on drawing package (4400 S Campbell Av) is not consistent with that found on the approved TD-DEV-0226-00050 (4502 S Campbell Av). Update the address on this drawing package to be consistent with TD-DEV-0226-00050.

2. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:

3. COMMENT: Corrected commercial building permit.

4. COMMENT: Provide a detailed response letter with your submittal that clearly shows how you have addressed all Zoning comments.

To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home .

Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/old-pdfs/double-old/resubmittals.pdf

If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov

The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code .
11/13/2026 Fire New Construction Standard REVIEW COMPLETED
10/23/2026 PDSD Application Completeness Express REVIEW COMPLETED