Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0826-01389
Parcel: 13409018G

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0826-01389
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/11/2026 Commercial Electrical Standard APPROVED
09/18/2026 Site Zoning Standard APPROVED
09/02/2026 Fire New Construction Standard NOT REQUIRED
09/10/2026 Outdoor Lighting Standard NOT REQUIRED No modifications to the outdoor lighting.
09/14/2026 Site Engineering Standard NOT REQUIRED
09/18/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/11/2026 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov
1. PV Racking Attachment to Canopy
A. Provide construction details showing the method of attachment and connection of the photovoltaic (PV) racking system rails to the roof framing members of the canopy. The connection details shown on the construction drawings shall be consistent with and match the connections designed and indicated in the submitted structural calculations.
B. Provide the applicable referenced detail drawings on the construction documents, including the attachment hardware, fasteners, connection configuration, and supporting roof framing members. Clearly identify the detail reference at each applicable PV racking attachment location.
C. The structural calculations and construction drawings shall be coordinated and demonstrate that the proposed connections and supporting framing are designed for all applicable loads.
2024 IBC Sections 107.2.1, 1603.1, and 1603.1.8.1
Please contact me if you have any questions about the above comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
08/27/2026 PDSD Application Completeness Express REVIEW COMPLETED