Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0826-01270
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/12/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/12/2026 | Addressing Validation | REQUIRES RESUBMIT | If you have questions regarding this Review, please email at PDSD-Permits@tucsonaz.gov Please resubmit addressing the following comments: 1) Please submit a plan with full address, including specific unit number. 2) Submit a Change of Address Request to include unit number to permit application https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/sub-records_071425.pdf |
||
| 08/12/2026 | Commercial Electrical Express | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0826-01270 (1431 E BENSON HY TUCSON, AZ 85714) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. The replacement of the existing service equipment requires the submission of a basic riser-diagram. >>> Note, you submitted personal health insurance information. 2. Provide an electrical riser diagram, NEC 230.9. a. Show each meter and address/unit associated with each meter. b. Show bus bar rating and AIC ratings of the new equipment. c. Highlight the parts, conductors, equipment, etc, being replaced. Provide sizing and other info as needed to verify code compliance. |
||
| 08/12/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |