Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0825-01600
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/26/2025 | Site Zoning Standard | APPROVED | |||
| 09/23/2025 | Water - PDSD Standard | APPROVED | |||
| 09/12/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 09/16/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 09/26/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/12/2025 | Commercial Building Standard | REQUIRES RESUBMIT | September 12, 2025 1st Review Intertech Architectural Interiors Attn: Erin Hastreiter 6089 E. Grant Road Tucson, Arizona 85712 Re: WEIR MINERALS TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0825-01600 Stantec Project Number: 185215066 Stantec File Number: TUC-25-092 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms F-1 V-B 16,703 63 Yes Yes B 29 Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, high-strength bolts, field welding. ARCHITECTURAL COMMENTS General 1. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors, high-strength bolts, field welding. STRUCTURAL COMMENTS General 1. Please provide structural calculations for engineered design. Sheet S3 1. The structural details do not indicate an offset footing design. The architectural sheets indicate multiple offset footings. Please coordinate with the architectural floor plan and provide the additional footing design/s. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 09/12/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | September 12, 2025 1st Review Intertech Architectural Interiors Attn: Erin Hastreiter 6089 E. Grant Road Tucson, Arizona 85712 Re: WEIR MINERALS TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0825-01600 Stantec Project Number: 185215066 Stantec File Number: TUC-25-092 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms F-1 V-B 16,703 63 Yes Yes B 29 Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, high-strength bolts, field welding. ARCHITECTURAL COMMENTS General 1. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors, high-strength bolts, field welding. STRUCTURAL COMMENTS General 1. Please provide structural calculations for engineered design. Sheet S3 1. The structural details do not indicate an offset footing design. The architectural sheets indicate multiple offset footings. Please coordinate with the architectural floor plan and provide the additional footing design/s. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 09/12/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | September 12, 2025 1st Review Intertech Architectural Interiors Attn: Erin Hastreiter 6089 E. Grant Road Tucson, Arizona 85712 Re: WEIR MINERALS TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0825-01600 Stantec Project Number: 185215066 Stantec File Number: TUC-25-092 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms F-1 V-B 16,703 63 Yes Yes B 29 Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, high-strength bolts, field welding. ARCHITECTURAL COMMENTS General 1. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors, high-strength bolts, field welding. STRUCTURAL COMMENTS General 1. Please provide structural calculations for engineered design. Sheet S3 1. The structural details do not indicate an offset footing design. The architectural sheets indicate multiple offset footings. Please coordinate with the architectural floor plan and provide the additional footing design/s. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 09/12/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | September 12, 2025 1st Review Intertech Architectural Interiors Attn: Erin Hastreiter 6089 E. Grant Road Tucson, Arizona 85712 Re: WEIR MINERALS TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0825-01600 Stantec Project Number: 185215066 Stantec File Number: TUC-25-092 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms F-1 V-B 16,703 63 Yes Yes B 29 Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, high-strength bolts, field welding. ARCHITECTURAL COMMENTS General 1. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors, high-strength bolts, field welding. STRUCTURAL COMMENTS General 1. Please provide structural calculations for engineered design. Sheet S3 1. The structural details do not indicate an offset footing design. The architectural sheets indicate multiple offset footings. Please coordinate with the architectural floor plan and provide the additional footing design/s. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 09/22/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 09/02/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |