Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0825-01552
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/14/2026 | Commercial Building Standard | APPROVED | |||
| 01/06/2026 | Commercial Electrical Standard | APPROVED | |||
| 01/14/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/06/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | The vent for the grease interceptor shall rise vertically to at least 6” above the flood rims of the grease interceptor prior to running horizontally (i.e., the vent needs to connect to the interceptor drain closer to the nearest wall). Reference: Section 905.4, IPC 2018. [Initial comment: The break room includes fixtures that apparently have been added since the last building permit was approved. Provide sealed drawings to show that all of the existing plumbing fixtures and piping have been installed in compliance with the current plumbing code. Reference: Section 107.2.1, IBC 2018.] | ||
| 12/30/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |